System Installation and Deployment
Using the following instructions to install and deploy the storage system.
Install the BBM (Battery Backup Module) in their appropriate controllers if needed.
。
BBM supports hot pluggable. Regardless of the system is turned on or off.
。
Remove the cover of BBM.
。
Insert the BBM.
。
Use two screws to tighten the BBM.
At the rear, check that the Master Controller is in its slot (CTRL 1).
If desired, install the optional Slave Controller in its slot (CTRL 2, only for dual-controller).
Install the Rail Kit onto the unit and insert it into the rack.
CAUTION: The system is very heavy. It’s recommend that a mechanical lifter or
at least two persons be used to raise and align the system to prevent injury
during installation. Use care when inserting or removing a system into or out of
a rack to prevent the accidental tipping or the rack causing damage or personal
injury.
Install the disk drives.
Connect the management port cable and data port cables on the network plan, the topology
examples are as follows.