background image

50

25

25

Air Ventilation Through Chimney Chase

Air Ventilation Through Top Flashing

D

raw

ings

No

tTo

Sc

al

e

Non combustible material

Hebel Block or

12 mm Promatect H board

or similar under the flashing

Oversized casing cover

is necessary

150 mm

minimum

150 mm

minimum

Spigot flashing to suit

flue pipe casing

Drip

Line

Drip

Line

flue pipe

flue pipe casing

25

25

Fig. 20

Typical Cowl

Casing Cover

Air Gap 

Top Spider

Approved 

Flashing

Air

Vents

min 2 x 80mm dia 

or equal square or 

rectangle shaped 

area

min 25mm gap between flue

pipe casing & combustible

surface

EXTERNAL REQUIREMENTS – SOLID FUEL

Refer to AS/NZS2918:2001; 4.9.1

Note:

All external air vents &

ceiling penetrations must be bird

& rodent proofed with permanently

fixed screens

D

raw

ing

No

tTo

Sc

al

e

Minimum 25mm gap between

flue pipe casing

& combustible surface

Air Vent

min 2 x 80mm diam. or equal square or rectangle shaped area

Promina Board or similar

Hebel Block

Note:

All external air vents & ceiling penetrations must be bird & rodent proofed with permanently fixed screens

Fig. 21

Fig. 22

FLUE PENETRATION

CHIMNEY CHASE AIR VENTILATION

6.TMWG.14

EXTERNAL REQUIREMENTS – GAS

Refer to AS/NZS 5601:2013

Summary of Contents for 700

Page 1: ...warranty Due to continued product improvement The Fireplace Ltd reserves the right to change product specifications without prior notification Please check to ensure you have the latest installation...

Page 2: ...hield Firebox Installation Gas Requirements Plan Section Drawing Plan Section Recessed Drawing Masonry Cavity Dimensions Solid Fuel Flue Installation Gas Flue Installation Flue Penetration Chimney Cha...

Page 3: ...IN HEATER INSTALLATION CLEARANCES WHEN OPERATING THIS APPLIANCE AS AN OPEN FIRE USE A FIRE SCREEN THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL TIMES IN ACCORDANCE WITH THESE INSTRUCTIONS US...

Page 4: ...ather available 1050IGC Box is ONLY for gas installations MODEL A A1 A2 B C D E F Y Off set Gather Indoor Gas Burner 700 700 800 750 400 700 225 325 200 680 295 395 Yes 850 850 950 900 450 700 250 350...

Page 5: ...ensure allowance is made to place non combustible internal wall lining eg Promatect H to cover the extent of the Hebel panel surround shown shaded Directly touching the firebox with any board or plas...

Page 6: ...r entry between the inner flue pipe and flue pipe casing or the air circulation between the vent holes in the cavity 7 Once the flue system is installed place a minimum 300mm hebel block over the top...

Page 7: ...ns must be bird rodent proofed with permanently fixed screens Gib Board Hebel Block Non combustible material eg Promatect H Lintel Bar Rock Wool insulation see Table 2 Secure the firebox with 2 x 12mm...

Page 8: ...x with 2 x12mm dynabolts for earthquake retraints Maintain the air intake unobstructed Floor Protector Fig 10 Fig 11 B see Table 2 Note All external air vents ceiling penetrations must be bird rodent...

Page 9: ...Floor Protector dimension RECESS REQUIRED 40mm Min 100mm Max Allow gas line into firebox if applicable Air Vent Y Refer toTable 2 for Floor Protector dimension Air Vent min 2 x 100 x 50mm or 80mm diam...

Page 10: ...side wall space make allowance min 2 x 80mm diameter or equivalent at the top of the chimney chase Pg 14 Ensure vents are bird and vermin proofed CROSS SECTION CAVITY PREPARATION 6 TMWG 10 Drawing No...

Page 11: ...pipe to be connected to the burner 2 Location of the hole should align with the gap between the gas grate s supporting legs 3 The gas supply pipe enters the firebox above the base plate to terminate u...

Page 12: ...ver spigot when fitted sizing measuring and cutting down should be carried out prior to the flue pipe casing being fitted over the flue pipe 2 Before fitting casing cover place the spider in oppositio...

Page 13: ...out prior to the flue pipe casing being fitted over the flue pipe 7 Before fitting casing cover place the spider in opposition with the spider post facing down between the flue pipe and flue pipe casi...

Page 14: ...r rectangle shaped area min 25mm gap between flue pipe casing combustible surface EXTERNAL REQUIREMENTS SOLID FUEL Refer to AS NZS2918 2001 4 9 1 Note All external air vents ceiling penetrations must...

Page 15: ...75 850 250 350 400 400 1050 IGC 250 300 350 350 1050 300 400 450 450 1200 400 500 550 550 1500 450 550 600 600 Table 4 CHIMNEY CHASE MINIMUM TRIM OUT 6 TMWG 15 MODEL A B C GAS B 700 1100 400 75 8 300...

Page 16: ...fer below for air vent sizing and suggested location Fig 26 Location points A B C D are suggested combinations A minimum of one pair of air vents is recommended or one large vent as per location point...