min 2 x 80mm diam. or equal square or rectangle shaped 

air vents to be wall or floor mounted

Heat Shield

Gib Board 

Hebel Block

Maximum 100mm recess

Floor Protector (refer to Table 4)

A1 (refer to Table 1) + 200mm + plaster or 

Non Combustible lining

Rock Wool 

Insulation

(Glue rock wool 

using fire cement 

to the firebox &

gather)

C

+ recess value 

(refer to Table 2)

A

(refer to Table 2)

Non Combustible material

(e.g Promatect H)

100

m

in

75

Flue Pipe Casing

S/S Flue Pipe

Heat Shield

Rock Wool 

Insulation

(Glue rock wool 

using fire cement 

to the firebox &

gather)

Gib Board

Hebel Block

Non Combustible material

(e.g Promatect H)

Maximum 100mm recess

Secure firebox with 2 x12mm 

dynabolts for earthquake 

retraints

Maintain the air intake 

unobstructed

Floor Protector

Fig. 10

Fig. 11

B

(see Table 2)

Note:

All external air vents & ceiling penetrations must 

be bird & rodent proofed with permanently fixed screen

Rebate to suit tiles or other non

combustible material on Floor

Protector

It is important to ensure the Jetmaster firebox is seated at the 

required finished Floor Protector level

see Table 4

min 25mm from flue pipe casing to combustible material

25

25

Note:

Fig. 10 & Fig. 11 refers to installations where the firebox is recessed.

Maximum recess = 100mm

D

raw

ing

No

tTo

Sc

al

e

D

raw

ing

No

tTo

Sc

al

e

Optional 

Finishing: 

Stone, Brick, 

Plaster on 

Brick

min 2 x 80mm dia

or equal square or 

rectangle shaped air 

vents to be wall or 

floor mounted

TIMBER FRAME CROSS SECTION - RECESS

TIMBER FRAME PLAN - RECESS

IL

6.TMWG.8

Summary of Contents for 700

Page 1: ...warranty Due to continued product improvement The Fireplace Ltd reserves the right to change product specifications without prior notification Please check to ensure you have the latest installation...

Page 2: ...hield Firebox Installation Gas Requirements Plan Section Drawing Plan Section Recessed Drawing Masonry Cavity Dimensions Solid Fuel Flue Installation Gas Flue Installation Flue Penetration Chimney Cha...

Page 3: ...IN HEATER INSTALLATION CLEARANCES WHEN OPERATING THIS APPLIANCE AS AN OPEN FIRE USE A FIRE SCREEN THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL TIMES IN ACCORDANCE WITH THESE INSTRUCTIONS US...

Page 4: ...ather available 1050IGC Box is ONLY for gas installations MODEL A A1 A2 B C D E F Y Off set Gather Indoor Gas Burner 700 700 800 750 400 700 225 325 200 680 295 395 Yes 850 850 950 900 450 700 250 350...

Page 5: ...ensure allowance is made to place non combustible internal wall lining eg Promatect H to cover the extent of the Hebel panel surround shown shaded Directly touching the firebox with any board or plas...

Page 6: ...r entry between the inner flue pipe and flue pipe casing or the air circulation between the vent holes in the cavity 7 Once the flue system is installed place a minimum 300mm hebel block over the top...

Page 7: ...ns must be bird rodent proofed with permanently fixed screens Gib Board Hebel Block Non combustible material eg Promatect H Lintel Bar Rock Wool insulation see Table 2 Secure the firebox with 2 x 12mm...

Page 8: ...x with 2 x12mm dynabolts for earthquake retraints Maintain the air intake unobstructed Floor Protector Fig 10 Fig 11 B see Table 2 Note All external air vents ceiling penetrations must be bird rodent...

Page 9: ...Floor Protector dimension RECESS REQUIRED 40mm Min 100mm Max Allow gas line into firebox if applicable Air Vent Y Refer toTable 2 for Floor Protector dimension Air Vent min 2 x 100 x 50mm or 80mm diam...

Page 10: ...side wall space make allowance min 2 x 80mm diameter or equivalent at the top of the chimney chase Pg 14 Ensure vents are bird and vermin proofed CROSS SECTION CAVITY PREPARATION 6 TMWG 10 Drawing No...

Page 11: ...pipe to be connected to the burner 2 Location of the hole should align with the gap between the gas grate s supporting legs 3 The gas supply pipe enters the firebox above the base plate to terminate u...

Page 12: ...ver spigot when fitted sizing measuring and cutting down should be carried out prior to the flue pipe casing being fitted over the flue pipe 2 Before fitting casing cover place the spider in oppositio...

Page 13: ...out prior to the flue pipe casing being fitted over the flue pipe 7 Before fitting casing cover place the spider in opposition with the spider post facing down between the flue pipe and flue pipe casi...

Page 14: ...r rectangle shaped area min 25mm gap between flue pipe casing combustible surface EXTERNAL REQUIREMENTS SOLID FUEL Refer to AS NZS2918 2001 4 9 1 Note All external air vents ceiling penetrations must...

Page 15: ...75 850 250 350 400 400 1050 IGC 250 300 350 350 1050 300 400 450 450 1200 400 500 550 550 1500 450 550 600 600 Table 4 CHIMNEY CHASE MINIMUM TRIM OUT 6 TMWG 15 MODEL A B C GAS B 700 1100 400 75 8 300...

Page 16: ...fer below for air vent sizing and suggested location Fig 26 Location points A B C D are suggested combinations A minimum of one pair of air vents is recommended or one large vent as per location point...

Page 17: ...tructed of combustible material it must be located within the shaded area defined in Fig 28 Fig 28 Projection mm Combustible Materials Non Combustible Materials CLEARANCE TO COMBUSTIBLE MANTELS 6 TMWG...

Reviews: