![JEI DRILLING & CUTTING SOLUTIONS RAILBEAST RDP-36 Operator'S Manual Download Page 17](http://html.mh-extra.com/html/jei-drilling-and-cutting-solutions/railbeast-rdp-36/railbeast-rdp-36_operators-manual_641791017.webp)
WWW.JEIUK.COM
RAILBEAST RDP-36
This document is protected by copyrights.
Copying, using, or distributing without permission of Ansa Group Ltd is prohibited.
17
3.8. Connecting and disconnecting the cooling system
When
using
an annular cutter, attach the cooling system to the fitting (
1
), and then fill
the bottle with a coolant. Do not use only water as the coolant. However, using
emulsions formed from drilling oil and water is adequate. Next, open the valve
2
, and
then rotate the handle
3
and move it up-down several times to build a pressure inside
the bottle.
To
disconnect,
close
the
valve
2
,
pull
up
the release
valve
(
4
) to release excess
pressure, and then detach the cooling system from the fitting.
1
2
3
4