
62/122
RUNNING RIGGING FOR THE SPINNAKER
Rope designation
Num
ber
Type
Colour
Diam.
(mm)
Length (m)
1 Spinnaker sheet
2
Dy
Red
12
27
2 Spinnaker guy
2
Dy
Green
12
27
3
Spinnaker boom
downhaul
1
FO
Black/red
10
23
4
Spinnaker boom top-
ping lift
1
FO
Grey
10
40
5 Spinnaker halyard
1
Dy
Red
12
45
6
Spinnaker boom tra-
veller adjusting line
1
FO
Grey
8
5
Dy: Dyneema
FO: Halyard braid
Summary of Contents for SUN ODYSSEY 49 DS
Page 1: ...SUN ODYSSEY 49 OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 8: ......
Page 16: ......
Page 26: ...22 122 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Page 28: ......
Page 30: ......
Page 36: ......
Page 42: ......
Page 46: ......
Page 50: ......
Page 62: ......
Page 68: ......
Page 69: ...65 122 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 70: ...66 122 5 3 1 ISO 10 240 3 CABINS 2 WASH ROOMS 4 CABINS 3 WASH ROOMS 4 CABINS 4 WASH ROOMS...
Page 72: ......
Page 78: ......
Page 90: ......
Page 92: ......
Page 96: ......
Page 98: ......
Page 100: ...96 122 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 102: ......
Page 116: ......
Page 117: ...113 122 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 120: ......
Page 121: ...117 122 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 124: ......
Page 126: ......