
115/122
HOISTING
- Install a fore rope, a rear rope and fenders.
- When craning, check that no device is crushed by the belts (sounder, speedometer, shaft, etc.).
- Mark the belt position with adhesive tape on the toe rail (most of the boats are already fitted with
these stickers). The belt position will be useful during the craning for a future launching.
- The crane hook will be fitted with a gantry or a spacer with two belts. The belts shall not be hooked
directly on the hook, since it would result in unusual compressive stresses on the hull.
- Hoist slowly. Control the movement of the boat with ropes.
AFTER LAUNCHING
- Check the sounder and speedometer fittings for tightness if need be.
- Open the valves and make sure that they are tight with the hull and relevant hose.
- Check the stuffing box for watertightness (Refer to chapter 9 "Stuffing box").
- Before starting the engine, refer to chapter 9 "Engine".
STEPPING THE MAST
Refer to chapter 5 "Rigging and Sails".
WARNING
Do not stay on board or under the boat during hoisting.
10
LAUNCHING
Summary of Contents for SUN ODYSSEY 49 DS
Page 1: ...SUN ODYSSEY 49 OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 8: ......
Page 16: ......
Page 26: ...22 122 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Page 28: ......
Page 30: ......
Page 36: ......
Page 42: ......
Page 46: ......
Page 50: ......
Page 62: ......
Page 68: ......
Page 69: ...65 122 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 70: ...66 122 5 3 1 ISO 10 240 3 CABINS 2 WASH ROOMS 4 CABINS 3 WASH ROOMS 4 CABINS 4 WASH ROOMS...
Page 72: ......
Page 78: ......
Page 90: ......
Page 92: ......
Page 96: ......
Page 98: ......
Page 100: ...96 122 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 102: ......
Page 116: ......
Page 117: ...113 122 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 120: ......
Page 121: ...117 122 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 124: ......
Page 126: ......