
49/122
UNSTEPPING THE MAST
- Mark the rope locations with stickers.
- Proceed in reverse order compared with the mast installation.
CABLE ADJUSTMENT
A professional carried out the pre-adjustment and the cable tightening.
After a few sea trips, adjust the mast definitively to get a perfect widthwise rectitude of the mast.
To keep the mast straight lengthwise
when sailing
get a balanced adjustment when in port:
- Slightly pre-bend the mast lengthwise, the middle of the mast bending forwards and the head
backwards.
- The pole shall be about half the section of the profile.
BALANCE ADJUSTMENTS IN PORT
- Before you fasten the backstay, tighten the upper shrouds (because the boat is rigged with swept
back spreaders).
- Tighten hard the whole rigging (when sailing with 15 to 20 knots, the leeward rigging is slightly
slack and it is normal).
- When you get a perfect widthwise and lengthwise rectitude when in port, symetrically slacken the
aft lower shrouds (on portside and starboard) by 2 bottle screw turns.
- To end the lengthwise adjustment, tighten hard the backstay bottle screw till you get a fair stability
of the forestay when sailing with a wind at 15 to 20 knots.
Keep all the bottle screws adjusted and use the pins. Keep the adjustment throughout your sailing
season.
ADVICE: When you are not sailing, slacken the backstay.
5
RIGGING AND SAILS
Summary of Contents for SUN ODYSSEY 49 DS
Page 1: ...SUN ODYSSEY 49 OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 8: ......
Page 16: ......
Page 26: ...22 122 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Page 28: ......
Page 30: ......
Page 36: ......
Page 42: ......
Page 46: ......
Page 50: ......
Page 62: ......
Page 68: ......
Page 69: ...65 122 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 70: ...66 122 5 3 1 ISO 10 240 3 CABINS 2 WASH ROOMS 4 CABINS 3 WASH ROOMS 4 CABINS 4 WASH ROOMS...
Page 72: ......
Page 78: ......
Page 90: ......
Page 92: ......
Page 96: ......
Page 98: ......
Page 100: ...96 122 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 102: ......
Page 116: ......
Page 117: ...113 122 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 120: ......
Page 121: ...117 122 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 124: ......
Page 126: ......