
48/122
5.3.2 ISO 10 240
CLASSICAL MAST / MAST PERFORMANCE
1. Masthead lights
2. Backstay attachment
3. Spinnaker halyard sheave
4. Shroud attachment
5. Eye for spinnaker halyard block
6. Forestay attachment
7. Genoa halyard sheave
8. Flying baby stay fitting (optional extra)
9. Spi pole lift halyard sheave (genoa 2)
10. Lazy jack eye
11. Spreader atta Shroud attachment
12. Wire for radar
13. Engine navigation light/Deck searchlight
14. Spi pole traveller sheave
15. Genoa halyard exit
16. Spi halyard exit
17. Boom topping lift exit
18. Spi pole topping lift exit
19. Main halyard exit
20. Automatic reef eyes
21. Gooseneck
22. Spi pole rail
23. Step
24. Spi pole traveller adjustment cleat
25. Spi pole traveller control
26. Vang fittings
27. Mast step
28. Main topping lift cleat
29. Main sheet eye
Summary of Contents for SUN ODYSSEY 49 DS
Page 1: ...SUN ODYSSEY 49 OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 8: ......
Page 16: ......
Page 26: ...22 122 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Page 28: ......
Page 30: ......
Page 36: ......
Page 42: ......
Page 46: ......
Page 50: ......
Page 62: ......
Page 68: ......
Page 69: ...65 122 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 70: ...66 122 5 3 1 ISO 10 240 3 CABINS 2 WASH ROOMS 4 CABINS 3 WASH ROOMS 4 CABINS 4 WASH ROOMS...
Page 72: ......
Page 78: ......
Page 90: ......
Page 92: ......
Page 96: ......
Page 98: ......
Page 100: ...96 122 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 102: ......
Page 116: ......
Page 117: ...113 122 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 120: ......
Page 121: ...117 122 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 124: ......
Page 126: ......