
An optional staysail releasable forestay may be installed (adjustment by ha-
lyard).
It is incumbent on the owner to have his boats equipped with a staysail.
The mainsail, genoa and fore staysail sheets, the topping lift, the reefi ng lines,
the mainsail and spinnaker halyards, the control lines for the main sheet tra-
veller are led back to the manoeuvre station.
The genoa may be optionally installed on an electric roller furler operated by a
switch from the helm stations.
In case of problem, please refer to the instructions given in the APPENDIX.
n
WINCHES
The boat may be fi tted with optional electric sheet and manoeuvring win-
ches.
The automatic breakers of the electric winches are located on the panel in the
port aft cabin.
The 12 V electric engines and relays are located in the cockpit aft lockers on
both the port and starboard sides.
Recharge the batteries after sailing one day and using electric winches.
RIGGING / SAILS
3.3
FORE STAYSAIL
31
3
3.4 RUNNING RIGGING
Summary of Contents for 53
Page 1: ...USER GUIDE...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 9: ...7 1 SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS...
Page 10: ......
Page 14: ......
Page 16: ...14...
Page 28: ......
Page 44: ......
Page 52: ......
Page 64: ......
Page 76: ......
Page 77: ...ELECTRICITY 7 1 12 V CIRCUIT 7 2 INVERTER 7 3 230 V CIRCUIT 7 4 ELECTRONICS 75 7...
Page 90: ......
Page 100: ......
Page 101: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 99 9...
Page 102: ...100...
Page 104: ......
Page 105: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 103 10...
Page 106: ...104 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 400 mm 1000 mm...
Page 108: ......
Page 110: ...108...
Page 120: ......
Page 121: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 119 12...
Page 124: ......
Page 126: ......
Page 127: ......
Page 128: ......