
- Take ashore all the ship’s log, the ropes that are not used for mooring her,
the galley equipment, supplies, clothes, the safety equipment.
- Check the expiry dates of the safety equipment.
- Have the liferaft overhauled.
Take advantage of this laying up to draw up a complete inventory of the equip-
ment.
n
WATER SYSTEM
- Drain the fresh water system.
Let water run from the taps until the system runs dry.
Check that there is no water left in the pipes and hoses (possible low points).
- Take off the fi lters, remove the water.
Clean the fi lters if necessary then put them back.
- Drain the water heater.
Check that there is no water left.
Close the drain.
- Lubricate all the water inlet valves and sea cock fi ttings.
- Rinse and completely drain the toilets bowls.
n
INSIDE
- Seal air inlets as much as you can.
- Install an air dehumidifi er in the saloon and leave the cabin and storage unit
doors open (stowage cupboards, icebox).
- Leave the cushions outside for long before putting them back into the boat in
the upright and side position in order to have minimum contact surfaces.
- Drain and clean the bilges.
- Possibly place the fl oorboards in a vertical position to make possible the
ventilation of the different compartments.
- Open the refrigerator / freezer doors.
n
OUTSIDE
- Carefully drain the cockpit shower.
- Thoroughly rinse the hull and deck.
- Lubricate all the mechanical and mobile parts with vaseline (bolts, hinges,
locks, etc.).
- Protect all ropes and mooring lines against chafi ng.
- Protect the boat to the highest degree with fenders.
- Make sure the boat is properly moored.
n
ENGINE
The engine winterisation shall be carried out by a professional.
Depending on the boat location, afl oat or ashore, winterisation is different.
WINTER STORAGE
9.2
PROTECTION
101
9
9.1
LAYING UP
Summary of Contents for 53
Page 1: ...USER GUIDE...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 9: ...7 1 SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS...
Page 10: ......
Page 14: ......
Page 16: ...14...
Page 28: ......
Page 44: ......
Page 52: ......
Page 64: ......
Page 76: ......
Page 77: ...ELECTRICITY 7 1 12 V CIRCUIT 7 2 INVERTER 7 3 230 V CIRCUIT 7 4 ELECTRONICS 75 7...
Page 90: ......
Page 100: ......
Page 101: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 99 9...
Page 102: ...100...
Page 104: ......
Page 105: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 103 10...
Page 106: ...104 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 400 mm 1000 mm...
Page 108: ......
Page 110: ...108...
Page 120: ......
Page 121: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 119 12...
Page 124: ......
Page 126: ......
Page 127: ......
Page 128: ......