Operation
Working with the Machine
126
126
9811/9950-1
Lifting With the Excavator
!M
WARNING
You must turn on the overload warning system before
you use the excavator for object handling, or a
stability hazard could occur.
8-2-8-20
Lifting operations must be carried out with the overload
warning system turned ON,
Note: Use a signalman when lifting with the excavator.
Make sure you both understand and use the recognized
signals. Keep all persons clear of the load and machine
while the load is on the excavator.
1
A bucket should be fitted when lifting with the
excavator to prevent the link swinging. Check that the
load is not greater than the safe working load for the
bucket.
T033970-2
Fig 57.
2
The correct JCB lifting shackle
A
must be fitted. The
bucket ram must be fully extended as at
B
. If your
machine is not fitted with this equipment there will be
A
B
C
HE Services
Summary of Contents for 8026 CTS
Page 2: ...0 0 9811 9950 Notes E S e r v i c e s...
Page 68: ...Operation Entering and Leaving the Cab 50 50 9811 9950 1 Fig 8 B A E S e r v i c e s...
Page 71: ...Operation Doors and Windows 53 53 9811 9950 1 C035100 Fig 11 E S e r v i c e s...
Page 103: ...Operation Operating Levers Pedals 85 85 9811 9950 1 731911 Fig 36 F E S e r v i c e s...
Page 105: ...Operation Operating Levers Pedals 87 87 9811 9950 1 731911 Fig 38 F E S e r v i c e s...
Page 111: ...Operation Operating Levers Pedals 93 93 9811 9950 1 796300 B4 Fig 43 A B D E S e r v i c e s...
Page 141: ...Operation Working with the Machine 123 123 9811 9950 1 731990 2 Fig 55 1 2 3 E S e r v i c e s...
Page 171: ...Operation Transporting the Machine 153 153 9811 9950 1 800990 4 Fig 68 E S e r v i c e s...
Page 257: ...Routine Maintenance Fuel System 239 239 9811 9950 1 T015790 2 Fig 93 A E S e r v i c e s...
Page 266: ...Routine Maintenance Tracks and Running Gear 248 248 9811 9950 1 Fig 98 E S e r v i c e s...
Page 320: ...Specifications Vibration 302 302 9811 9950 1 Page left intentionally blank E S e r v i c e s...