50
VTX A
8
| Rigging Manual
STEPS:
• Raise the suspended cluster of A8s and B18 and then align the ground cart of A8s underneath the suspended cluster.
• Once the two clusters are aligned, carefully lower the suspended cluster until the front attachment points are nearly touching.
Ensure that the attachment points are aligned and then lower the suspended cluster until the front attachment points come
together. Insert the two front QRP’s.
• With the front QRPs set, use the electric hoist to raise the array. Be aware that the lower cluster may swing forward slightly
as it lifts off the ground. Once the array is off the ground, grab the lower cluster by the rear VT handlebar and gently pull back
towards the rear of the array. While doing this, lower the array so that the front wheels of the VT touch the ground. Keep low-
ering the array until the rear attachment points engage and then insert the two rear QRP’s.
• Once all four QRP’s have been secured, lift the array off the ground and remove the VT.
1
2
3
4