User Manual Javo Plus en Plus Extra Potmachine
Version 2015-1
13
5.5
Check drill rotation direction
Check the rotation direction of the drill before you start working with the
machine.
Procedure:
1.
Connect the power cable.
2.
Start the drill.
a.
Turn on the main switch.
b.
Press the reset button emergency stop circuit.
c.
Start the drill with the drill button.
3.
Check the direction of rotation of the drill.
a.
The desired rotation direction is shown in this picture.
4.
Stop the drill by turning the drill switch off.
5.
Switch off the main switch.
6.
When rotation direction is incorrect:
a.
Remove the plug from the socket.
b.
Open the plug and switch 2 of the 3 phases in the plug. This should only be carried out by suitably
qualified personnel.
5.6
Check substrate conveyor tension
Check the substrate conveyor belt tension before you start working with
the machine.
Procedure:
1.
Check the substrate conveyor belt tension. The correct tension is
obtained when the belt in the middle deflects ± 40mm.
2.
Adjust the belt tension if necessary .
a.
Loosen the four screws (B) to the block bearings.
b.
The tension can be adjusted by simultaneously turning both
sides of the ground belt (A).
c.
Tighten the four screws (B) to the block bearings.
5.7
Check elevator belt tension
Check the elevator belt tension before you start working with the machine.
Procedure:
1.
Check the elevator belt tension. The correct tension is obtained when the belt in
the middle deflects ± 20mm.
2.
Adjust the belt tension if necessary .
a.
The tension can be adjusted using the two clamping nuts, located on
opposite sides of the elevator housing.
b.
Tighten the nuts (A) on both sides of the elevator equally.
The tension of the belt should not be too tight.
A