5-74
5.13. Check sheet
Check operation of the WT (Master/Slave) using the check sheet below.
Table 5-2 Check sheet
WT
Serial number
Test date
Test type
Test condition
Check item
Pass/fail Measured value
Check the Cable
between WT and
PoE
Maintenance
Tool
Connect the Management Tool to the WT and confirm
that login is possible normally.
Receive level
Maintenance
Tool
Connect the Management Tool to the WT and measure
the receive level.
dBm
measure
the
Received Blocks
Discarded Rate
Maintenance
Tool
Connect the Management Tool to the WT and measure
the Received Blocks Discarded Rate
Ping TEST
PC
Check the reply from opposite PC.
-
Summary of Contents for WIPAS2
Page 1: ...0 WIPAS2 INSTRUCTION MANUAL Point to Point Rev 1 3 20 Apr 2012...
Page 21: ...1 3 9 Others 9 82...
Page 30: ...2 12 2 2 External Views of the Units 2 2 1 WT in mm Figure 2 1 External View of the WT a 52...
Page 31: ...2 13 2 2 1 1 WT Nameplate Nameplate a Nameplate b Figure 2 2 Nameplate...
Page 35: ...2 17 2 2 2 WT External Antenna Type Figure 2 6 External View of the WT External Antenna Type...
Page 36: ...2 18 2 2 2 1 WT External Antenna Type Nameplate Nameplate a Figure 2 7 Nameplate...
Page 49: ...5 31...
Page 69: ...5 51 Figure 5 33 Measuring the Receive Level Master...
Page 70: ...5 52 Figure 5 34 Measuring the Receive Level Slave...
Page 89: ...5 71 Figure 5 53 1 2...
Page 101: ...9 83 WIPAS2 Instruction Manual H 7YZCM5107B Rev 1 3 20 Apr 2012...