HEADER
LH JAMB
RH JAMB
FLOOR
STEP 2: MOUNTING PLATES
►
If door will install to steel jambs, mounting plates for the door brackets are required and may be welded or bolted
to the jambs.
►
Top of mounting plates should be located 10" above top of opening and be level with each other. Side of
mounting plates should be even with edge of opening. If opening width is off, adjust locations accordingly.
STEP 1: WALL OPENING
►
Check wall opening width and height and verify these measurements against size of door to be installed.
►
Verify that jambs are plumb.
►
Check floor and header for level.
►
Check for adequate side clearance at jambs and clearance above and at sides of header.
Check vertical and horizontal headroom requirements.
See Figures 2 & 3 for minimum
requirements.
►
Verify that the guide mounting surface on the jamb is flush.
►
Make sure all parts required for installation are with the door.
FIGURE 4:
WALL OPENING
FIGURE 5:
MOUNTING PLATES
NOTE:
LEAVE FLATS OF BOLT HEADS IN VERTICAL POSITION. INSTALL WASHERS ON HEX NUT SIDE ONLY
3-
3
8
" -16 X 1-
1
4
"
HEX HEAD BOLT
LH MOUNTING PLATE
HEADER
RH MOUNTING PLATE
6-
1
2
"
10"
JAMB EDGE
OPENING
WIDTH
OPENING
HEIGHT
LEVEL MOUNTING PLATES