Page 12
Figure 13. Installing Pod and Cell Figure 14. Locking Ring Alignment Figure 15. Locking Ring Tool
Figure 16. Locking Ring Level
Figure 17. Connecting Cell Leads Figure 18. Pod Connector
9. Verify the gasket is attached to the upper clamp. The curved side of the gasket must be pointing down so that it
will create a seal with the pipe.
10. Secure the clamps, pipe spacer, and gasket around the pipe as shown (see Figure 10) making sure the
fl
ow arrows
on the clamp point in the direction of the water
fl
ow (see Figures 11 and 12). Make sure the two (2) clips on the
sides of the clamp are snapped into place.
11. Insert the o-ring into the channel on each of the clamps (see Figure 12).
15. Securely connect the cell leads to the like colored terminals (see Figure 17).
16. Attach the terminal cap.
17. Plug the pod connector into the power pack (see Figure 18).
Red
Red
Blue
Black
x
12. Install the cell and the pod making sure the pod is installed upstream from the cell. When installing the pod, make
sure the
fl
ow switch is inserted into the inlet port on the clamp (see Figure 13).
13. Position the locking ring in proper alignment, making sure the bump aligns with the top thread (see Figure 14).
14. Screw down the locking ring to the threaded clamp using the locking ring tool (see Figure 15).
NOTE
Ensure the locking ring is level when engaging the threading housing (see Figure 16).
Locking Ring Tool
Pod
Connector
Figure 11. Water Flow Arrows
Figure 10. Cell Clamps
Figure 12. Cell Attached
Water Flow
O-Ring
Gasket
(Attaches to the upper clamp)
Align the bump with
the high thread on
the lower clamp.
NOTE: The Upper
Clamp is not shown
in this diagram but it
should be installed.