2
TEE AND HOSE ASSEMBLY
1-1/2" MAX.
1-1/8" D.
KNOB
HANDLE
2" D.
3" TO 6"
5
3
WATER SUPPLY CONNECTIONS
Connect water supply to VALVE BODIES (1) with 1/2" IPS
FLEXIBLE SUPPLIES (3) or 3/8" O.D. BULL-NOSE RISERS (4).
Use wrench to tighten connections.
Do not over tighten. Be careful not to kink copper supply when
bending. Use tubing cutter to cut to proper length.
1
4
FERRULE
NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS MUST BE
PURCHASED SEPARATELY.
COUPLING
NUT
2" MAX.
2-1/8" D.
3" TO 6"
2" MAX.
7" MAX.
1 0 9 6 3 0
1 0 9 6 3 0
ROUGHING-IN
DIMENSIONS
Plumbers' Putty or Caulking
Adjustable Wrench
Phillips Screwdriver
Channel Locks
TOOLS REQUIRED
Tubing Cutter
Regular Screwdriver
Basin Wrench
MOUNTING
SURFACE
1-1/4" O.D.
NOTE: MOUNTING HOLES
ARE 1-1/8" D.
1/2" NPT INLETS
APPLY SEALANT
OR TEFLON TAPE
4
A FOAM SEAL (1) is installed on underside of FLANGE (2). (Plumbers
Putty may be used in place of FOAM SEAL (1) if desired.)
Apply sealant or Teflon tape to threads of TAILPIECE (10) and
thread into DRAIN BODY (7) making a water tight seal.
Drop FLANGE (2) into LAVATORY DRAIN (3). From below assemble
RUBBER GASKET (4), PLASTIC WASHER (5) and LOCK NUT (6) onto
DRAIN FLANGE (2). Do not tighten fully.
INSTALL POP-UP DRAIN
FIG. 4a
FIG. 4b
FIG. 4c
FIG. 4c
FIG. 4a
FIG. 4b
1
4
3
2
5
6
7
8
6
9
2
Adjust STOPPER (13) height by repositioning POP-UP ROD (16) in SWIVEL (15)
and tightening SET SCREW (18).
Assemble POP-UP SWIVEL (15) to PIVOT ROD (11) but do not tighten.
Drop POP-UP ROD (16) through other hole in POP-UP SWIVEL (15) and
tighten SET SCREW (17)
Assemble PIVOT ROD (11), and PIVOT NUT (12) as shown. Install CONCAVE
WASHER (19) into PIVOT ROD OPENING (9) if not preinstalled. Hand tighten
PIVOT NUT (12). Drop STOPPER (13) into drain.
(
To vandal proof drain rotate STOPPER (13) so PIVOT ROD (11) goes
through EYE (14) of STOPPER (13)
. Make connection to "P" TRAP.
Inspect inside DRAIN BODY (7) that SEAL (8) is installed. Thread
DRAIN BODY (7) tight against FLANGE (2) to make a water tight seal.
10
9
7
6
12
19
16
15
17
18
2
10
14
13
11
The PIVOT ROD OPENING (9) in DRAIN BODY (7) should face the rear
of the lavatory. Tighten LOCK NUT (6) on FLANGE (2) to make a water
tight connection with channel locks. Do not over tighten.
2" D.
Teflon Tape
15
COLD
10
12
13
14
1
SPOUT ASSEMBLY
Make sure SHANK O-RING (1) is in place. Thread TEE (2)
onto end of SPOUT SHANK (3).
Rotate TEE (2) about10 degrees from center. Insert HEX
COUPLING NUT (4) into TEE (2) and tighten on end of spout
shank to make a water tight connection. Do not over tighten.
Make sure FIBER WASHERS (5) are installed in TEE (2).
Connect HOSE ENDS (6) of FLEX HOSE (7) to TEE (2).
Tighten securely.
3
1
5
4
5 6
7
2
Make sure RING WASHER (3) is properly positioned into
SPOUT BASE (8). Insert SPOUT SHANK (1) through center hole
of SINK (2).
Assemble RUBBER WASHER (4), BRASS WASHER (5) and
LOCKNUT (6) onto threads of SPOUT SHANK (1) from
underside of SINK (2).
Insert LIFT ROD (7) through SPOUT (9) and cut out of BRASS
WASHER (5).
Align SPOUT (9) and tighten LOCKNUT (6). Be sure cut out in
BRASS WASHER (5) is positioned as shown.
7
8
1
3
4
6
5
CUT OUT
2
Turn off hot and cold water
supplies before beginning.
CAUTION
6
7
9
Insert BRASS FRICTION WASHERS (14) and RUBBER SEAL
WASHERS (15) into COUPLING NUTS (10). Loop SUPPLY
HOSES (12) if required to avoid kinking. Tighten COUPLING
NUTS (10) to outlets of VALVE BODIES (9).
3
INSTALL VALVE BODIES AND HANDLES
INSTALL HANDLES
1-1/4'' MAX.
STEM ADAPTER
Thread LOCKNUT (8) to bottom of VALVE BODY (9). Make sure
FIBER WASHER (10) and RUBBER WASHER (11) are installed.
Insert VALVE BODY (9) through mounting hole from underside
of lavatory or mounting surface.
Note: VALVE BODY marked Hot is installed in the left mtg. hole,
VALVE BODY marked Cold in the right when facing front of fitting.
Maximum mounting surface thickness is 1-1/4".
From top install STOP RING (7). Thread LOCK RING (6) with seal washer
onto VALVE BODY (9) until tight against it's internal stop. Thread
ESCUTCHEON RING (5) onto VALVE BODY (9) until tight against it's
internal stop.
Set VALVE BODIES (9) so that their outlets are facing toward SPOUT
SHANK (13). Tighten LOCKNUT (8) using 35mm or adjustable
wrench to secure the valve bodies.
Thread counter-clockwise LEVER (1) from KNOB HANDLE (2) and
remove. With HEX WRENCH (3) (supplied) loosen SET SCREW (4)
and pull off handle from valve stem.
Remove ESCUTCHEON RING (5), LOCK RING (6) and STOP RING (7).
Note: Handle assemblies must be removed from valve bodies
before valve body installation.
HOT
JADO
MOUNTING
SURFACE
HOT
1
3
4
10
11
5
6
7
8
9
2
HEX WRENCH
(SUPPLIED)
Align LEVER HANDLES (1) as shown or as desired and
install HANDLE (2) onto STEM ADAPTER.
Tighten HANDLE SET SCREW (4) with HEX WRENCH (5)
supplied to secure HANDLE.
Thread LEVER (1) into handle.
2"
7-7/8"
3/4" D.
11-7/8"
6-1/2"