J-Allure
Center Panel Installation
(cont.)
Connect the ends of the flexible supply lines with adaptors to the hot and cold connections of the mixer.
The steam lines are to be routed in such a way that they travel up from the steam generators and down to the steam
heads. Using cable ties, tie up the steam lines so there are no kinks or low spots that may trap water. (Do NOT operate
the steam generators without the water supply ON as permanent damage to the generators will occur.)
Connect the steam lines to the generators using hose clamps.
For units with TV, insert audio cables, cable TV lead, fan and TV power cords through the hole in drip shield.
Plug the power cord into the 230 VAC outlet installed previously as shown in the rough-in section.
DANGER: RISK OF ELECTRIC SHOCK. Connect only to a circuit protected by a Ground Fault Circuit
Interrupter.
Reinstall hand held shower holder if removed. Apply sealant to mounting holes if holder was removed completely.
12
POWER SUPPLY CORD
3/8" COPPER TUBING
FROM 3/8" SUPPLY FITTING
HOT WATER
SUPPLY HOSE
COLD WATER
SUPPLY HOSE
CABLE TIES
230V OUTLET
FROM STEAM
FITTINGS ON BATH
DRIP SHIELD
(MODELS WITH
TV ONLY)
CABLE TV
FAN POWER CORD,
CABLE TV LEAD
AND AUDIO CABLES
POWER CORD FOR TV
(UNIT WITH TV SHOWN)
MIXER
Summary of Contents for J-ALLURE
Page 30: ......