J-Allure
Center Panel Installation
Connect the fixed male end of the flexible supply lines to the female supply connections in the wall cutout.
Position the center panel frame in the corner of the bath with the mounting tabs between the edge of the bath and wall.
To open the service door, remove the screw cover below the mixer handle and unscrew the exposed screw. To allow
the center panel door to be opened wider, it may be necessary to remove the hand held shower holder as shown below.
Open the door.
Unscrew the M6 bolt and install the two brackets. Check the plumbness with the two brackets touching the wall. If
necessary adjust the nut till the center panel is perpendicular to the shell deck.
Using the holes in the brackets as a guide, drill two 3/16" holes. Secure the frame to the wall using the wall anchors
and screws (#8x1"). Again check the plumbness and make sure the nuts are tight.
BATH RIM
CENTER
PANEL
FRAME
MOUNTING
TAB
SCREW
COVER
11
WALL ANCHOR
NUTS
BRACKET
90
°
(2 PLACES)
M6 BOLT
HAND HELD SHOWER
HOLDER COVER
CENTER PANEL DOOR
Summary of Contents for J-ALLURE
Page 30: ......