
Revision
Letter
Revision
Date
Made By
Applicable
ECNs
Details
F
06-01-04
MAW
N/A
Change to new layout.
G
01-05-05
MAW
N/A
Corrected amerate ratings, changed to thermostat bracket
changed thermostat 05930-121-71-29 to
thermostat kit
updated drawing for false panel
installation, and added SDI override instructions.
H
01-17-06
MAW
7609
Added universal timer, parts & schematics.
I
07-06-06
MAW
7713, 7571,
7493, 7553,
7411, 7422,
7231
Updated specification & dimension pages.
Updated drain quench assembly.
Replaced door switch 05930-003-02-20 with
Added false panel kit numbers, door component kits.
Replace ball stop components.
Replace thermostat 05930-121-71-29 with
Added the wash & rinse thermometer decals.
J
09-14-07
MAW
Obsoleting I/O manual, added warranty & repair centers.
Listed minimum cycle times.
Added Top Mount Control Box: dimensions, hood
weldment, control box & schematics.
Corrected the rinse tank cover number, updated the
cantilever support bracket & reed switch numbers.
K
10-08-08
ARL
7990
Added hi-limit thermostat set point instructions.
L
01-10-13
RLC
8252
Updated schematic and control box to reflect rotary switch.
M
03-07-13
RLC
QOF NDB-
219
Updated Jackson logo and company name.
N
03-24-14
MHH
Updated warranty page.
Removed "Stop" page.
Converted manual from Quark to InDesign.
O
04-16-14
MHH
8291
Changed pages 22, 25, 28 & 31
P
06-04-14
MHH
8287
New part & # for bearing on rinse arm assy, pg. 41.
Q
10-28-14
KAP
8298
Updated pg's. 4, 5, & 23 to accommodate new door's and new
Cantilever Arm.
R
12-01-14
KAP
N/A
Updated assembly numbers on pg. 31
S
04-06-15
KAP
N/A
Inserted note pertaining to corner installation pg. 6
T
04-07-15
KAP
ECR 8329
Added Tempstar HH, NB 208V-230V, 60HZ, Single phase pg. 54
U
06-05-15
KAP
N/A
Added Tempstar HH LT & Tempstar HH Ventless components
Updated solid state schematics on pg 60 & 61
Added NB/LT Schematic on page 69.
Updated 208-230V, 60HZ on page 65.
REVISION HISTORY
ii
Summary of Contents for TempStar Series
Page 2: ......
Page 28: ...PARTS 22 TOP MOUNTED CONTROL BOX ASSEMBLY 30 28 29 25 22 21 26 33 34 36 1...
Page 36: ...PARTS HOOD ASSEMBLY 30 1 5 4 2 3 6 7 10 8 9...
Page 60: ...PARTS 460 VOLT MACHINE TRANSFORMER MOUNTING BOX 54...
Page 61: ...PARTS PARTS 55 EXHAUST FAN CONTROL OPTION...
Page 66: ...ELECTRICAL SCHEMATICS SOLID STATE TEMPSTAR HH TOP MOUNT CONTROLS 208 230V 60HZ 1 3 PHASE 60...
Page 67: ...ELECTRICAL SCHEMATICS 61 TEMPSTAR HH UNIVERSAL TIMER 208 230V 60HZ 1 3 PHASE...
Page 68: ...ELECTRICAL SCHEMATICS 62 SOLID STATE TEMPSTAR HH TOP MOUNT W CYCLE SWITCHES 460V 60HZ 3 PHASE...
Page 69: ...ELECTRICAL SCHEMATICS TEMPSTAR HH UNIVERSAL TIMER 460V 60HZ 3 PHASE 63...
Page 70: ...ELECTRICAL SCHEMATICS TEMPSTAR HH S UNIVERSAL TIMER 208 230V 60HZ 1 3 PHASE 64...
Page 71: ...ELECTRICAL SCHEMATICS TEMPSTAR HH 208 230V 60HZ 1 3 PHASE 65...
Page 72: ...ELECTRICAL SCHEMATICS TEMPSTAR HH 460V 60HZ 3 PHASE 66...
Page 73: ...ELECTRICAL SCHEMATICS TEMPSTAR HH S 208 230V 60HZ 1 3 PHASE 67...
Page 74: ...ELECTRICAL SCHEMATICS TEMPSTAR HH NB 208V 230V 50 60HZ 1 PHASE 68...
Page 75: ...ELECTRICAL SCHEMATICS TEMPSTAR HH NB LT 208V 230V 50 60HZ 1 PHASE 69...
Page 76: ...70 ELECTRICAL SCHEMATICS OPTIONS SDI OPTION...
Page 77: ...ELECTRICAL SCHEMATICS OPTIONS EXHAUST FAN HOOKUP DRAIN QUENCH OPTIONS 71...
Page 78: ...Tempstar HH Series Installation Operation Technical Manual 07610 002 23 32 Issued 09 14 07...