07610-002-23-32-AD
14
For the first operation of each day, it might be necessary to run the machine through
three cycles to ensure that all of the cold water is out of the system and to verify that
the unit is operating correctly. To cycle the machine, ensure that the power is on and
that the tub has filled to the correct level. Lift and close the door and the cycle light will
illuminate. The unit will start, run through the cycle, and shut-off automatically. Repeat
this two more times. The unit should now be ready to wash a rack of ware.
To wash a rack, open the door completely (avoiding hot water that might drip from
the door) and slide the rack into the unit.
Close the door and the unit will start automatically. Once the cycle is complete, open
the door (again watching for the dripping hot water) and remove the rack of clean
ware. Replace with a rack of soiled ware and close the door. Repeat this process.
Based on use, the scrap screen might become clogged with soil and debris as the
workday progresses. Operators should regularly inspect the scrap screen to ensure
it has not become clogged. If clogged, it will reduce the washing capability of the
machine. Instruct operators to clean-out the scrap screen at regular intervals or as
required by workload. Do NOT beat strainers to remove debris.
1.
Turn machine off by flipping the power switch to “OFF.”
2.
Open the door and allow steam/heat to escape.
3.
Remove the standpipe and allow the tub to drain.
WARNING!
Wash tank water will be hot!
WARM-UP CYCLES
WASHING A RACK
OF WARE
OPERATIONAL
INSPECTION
SHUTDOWN &
CLEANING
!
WARNING
OPERATING INSTRUCTIONS
OPERATION
Summary of Contents for TEMPSTAR HH S
Page 35: ...07610 002 23 32 AD 26 1 5 4 2 3 6 7 10 8 9 HOOD PARTS ...
Page 61: ...07610 002 23 32 AD 52 VER SYSTEM PARTS 18 24 23 12 11 16 17 14 21 22 20 19 27 28 29 ...
Page 67: ...07610 002 23 32 AD 58 SCHEMATICS HH E VER 208 230 V NEW RINSE TANK ...
Page 68: ...59 07610 002 23 32 AD SCHEMATICS HH E VER 460 V NEW RINSE TANK ...
Page 69: ...07610 002 23 32 AD 60 SCHEMATICS HH E VER 208 230 V OLD RINSE TANK ...
Page 70: ...61 07610 002 23 32 AD SCHEMATICS HH E VER 460 V OLD RINSE TANK ...
Page 71: ...07610 002 23 32 AD 62 SCHEMATICS NB 208 230 V ...
Page 72: ...63 07610 002 23 32 AD SCHEMATICS NB 460 V ...
Page 73: ...07610 002 23 32 AD 64 SCHEMATICS HH S 208 230 V ...
Page 74: ...65 07610 002 23 32 AD SCHEMATICS SDI OPTIONS ...
Page 75: ......