
AJ-54C Series Technical Manual 7610-002-30-91
Issued: 03-22-2006 Revised: N/A
SECTION 6: PARTS SECTION
HEATER ASSEMBLY
70
Heater Chart
Model
Volts
Phase
KW
Part Number
All*
208
1
10
06401-003-12-94
230
1
10
06401-003-12-95
208
3
10
06401-003-12-94
230
3
10
06401-003-12-95
460
3
10
06401-003-12-96
575
3
10
06401-003-12-97
575
3
18
04540-003-06-22
600
3
10
06401-003-12-97
* - AJ-54CGP, AJ-54CS, AJ-76CGP, AJ-76CS and AJ-90CS models do not use electric heaters in the wash tank or power rinse
tank.
SERVICE NOTE:
When replacing the tub heaters, it is HIGHLY recommended that you also change out the gasket as well.
Once installed, gaskets become compressed and are subjected to extreme temperature changes. Replacing the gasket with a
new one when replacing the heater may prevent future leaks.
SERVICE NOTE:
The nuts used to secure the heater to the tub should be torqued to 16 in-lbs. After tightening, the unit should
be allowed to heat up and operate normally for approximately 30 minutes. Secure power to the machine and check the nuts
once more to ensure that they are torqued to 16 in-lbs.
See Heater Chart Below
Heater Gasket
05330-011-47-79
5/16” Lockwasher
05311-275-01-00
5/16”-18 Hex Nut
05310-275-01-00
Summary of Contents for Enodis AJ-54 Series
Page 9: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Page 24: ...16 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Page 41: ...33 SECTION 3 PREVENTATIVE MAINTENANCE ...
Page 45: ...37 SECTION 4 TROUBLESHOOTING SECTION ...
Page 49: ...41 SECTION 5 SERVICE PROCEDURES ...
Page 72: ...64 SECTION 6 PARTS SECTION ...
Page 132: ...124 SECTION 7 ELECTRICAL SCHEMATICS ...
Page 153: ...145 SECTION 8 JACKSON MAINTENANCE REPAIR CENTERS ...
Page 160: ......