
AJ-54C Series Technical Manual 7610-002-30-91
Issued: 03-22-2006 Revised: N/A
SECTION 5: SERVICE PROCEDURES
59
REPLACING THE WASH HEATER (CONTINUED)
13. The thermostat probe needs to be placed into the well of
the new heater. Again, use caution when doing this so that the
probe or the capillary tube do not become broken. If this
occurs, then the thermostat will have to be replaced.
14. Apply silicone to seal the well and hold the thermostat
probe in place.
15. Reattach the incoming power lines to the heater, ensuring
that you wire the heater correctly for either single or three
phase operation.
16. Using the torque wrench or a torque nutdriver (if available)
torqe the nuts holding the wires, jumpers and bus bars to 16
in-lbs.
17. Ensuring that all non-essential personnel are clear of the
area, close the drain valve(s) and restore power and water to
Putting the thermostat probe in the heater well
Three phase wiring
Tightening the nuts holding the power lines
Applying silicone to the heater well
Single phase wiring
Summary of Contents for Enodis AJ-54 Series
Page 9: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Page 24: ...16 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Page 41: ...33 SECTION 3 PREVENTATIVE MAINTENANCE ...
Page 45: ...37 SECTION 4 TROUBLESHOOTING SECTION ...
Page 49: ...41 SECTION 5 SERVICE PROCEDURES ...
Page 72: ...64 SECTION 6 PARTS SECTION ...
Page 132: ...124 SECTION 7 ELECTRICAL SCHEMATICS ...
Page 153: ...145 SECTION 8 JACKSON MAINTENANCE REPAIR CENTERS ...
Page 160: ......