
AJ-54C Series Technical Manual 7610-002-30-91
Issued: 03-22-2006 Revised: N/A
SECTION 5: SERVICE PROCEDURES
45
RACK RAIL STABILIZER KIT
First, remove three bolts, locknuts and flat washers at middle hood/tub junction.
Next, remove door splash shield.
Then, install new door splash shield using the three bolts, locknuts and flat washers.
Rack Rail Stabilizer
05700-011-34-63
Summary of Contents for Enodis AJ-54 Series
Page 9: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Page 24: ...16 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Page 41: ...33 SECTION 3 PREVENTATIVE MAINTENANCE ...
Page 45: ...37 SECTION 4 TROUBLESHOOTING SECTION ...
Page 49: ...41 SECTION 5 SERVICE PROCEDURES ...
Page 72: ...64 SECTION 6 PARTS SECTION ...
Page 132: ...124 SECTION 7 ELECTRICAL SCHEMATICS ...
Page 153: ...145 SECTION 8 JACKSON MAINTENANCE REPAIR CENTERS ...
Page 160: ......