OPERATING INSTRUCTIONS
OPERATION
Before operating the unit, verify the following:
1. Strainers are in place and clean.
2. Wash and rinse arms are screwed securely into place and end-caps are tight.
3. Wash and rinse arms rotate freely.
4. Chemical levels are correct.
To energize the unit, turn on the power at the service breaker. The voltage should
have been previously verified as correct. If not, the voltage must be verified before
energizing the unit.
1.
Verify the standpipe is installed correctly (seated vertically in the center of the
wash sump).
2. Close the door.
3.
Press the “Power” button.
4. The unit will automatically begin the fill cycle.
5. Once the wash tub is filled, the unit is ready for operation.
6. Wait for wash temperature to reach at least 155 °F before operating the unit.
PREPARATION
POWER UP
FILLING THE
WASH TUB
Summary of Contents for AVENGER HT-E
Page 2: ......
Page 38: ...30 07610 004 04 18 R CONTROL PANEL PARTS 1 8 3 2 4 5 6 7...
Page 48: ...40 07610 004 04 18 R WASH DRAIN MOTOR ASSEMBLY PARTS 10 11 12 13 1 2 3 4 5 9 8 6 7...
Page 54: ...46 07610 004 04 18 R RINSE TANK ASSEMBLY PARTS 8 7 6 5 2 3 4 1...
Page 59: ...51 07610 004 04 18 R SCHEMATICS 480 V 60 HZ 3 PHASE...