OPERATING PROCEDURES
SETUP INSTRUCTIONS
2. Use the hydraulic jack to support the weight. This can be
done with the
JACK
switch on the control pod or the
secondary toggle switch located on the frame near the towing
hitch.
3. Unpin the transit link(s).
4. Use the hydraulic jack to lower the bin to the ground.
4a. *FWD ELEVATOR. Pin the hitch to the frame to prevent
the hitch from dragging on the ground during opera on
5. The elevator is now ready to operate.
TRANSIT LINK
*FWD ELEVATOR
PIN
TRANSIT LINK
PIN
PIN
1. Start the engine and allow the temperature to reach 140
degrees Fahrenheit. Once temperature has been reached,
ac vate high idle switch for 5 seconds.
*Decal with instruc ons can be found on the side of the
control pod.
17