
OCEANO HD-55 Pull & Lift – User Guide
System:
HD-55
Preventive Maintenance
Sub-system
: HD-55
Reference:
PM02
Page:
2/4
Subject:
Dismantling the HD-55
Maintenance level: 2
Duration:
10 minutes
Part 2 - Removing the hook
Step
Action
1.
Remove the split pin GFV5-65-S.
2.
Remove the nut (9102984-2) of the bottom hook axis (9102984
-1
) and the washer
(9102986).
3.
While holding the releasing hook (9103084), remove the ROV handle locking pin
(9102984).
4.
Recover the releasing hook and washers.
5.
End of procedure.
Figure 6 – Release hook
MU-HD55P&L-AN-001 Ed. G – October 2013
18