
OCEANO HD-55 Pull & Lift – User Guide
IV
M
AINTENANCE
Here are listed the preventive maintenance operations that can be performed on the HD-
55 system:
•
PM01
: Cleaning the HD-55
•
PM02
: Dismantling the HD-55
•
PM03
: Reassembling the HD-55
•
PM04:
Checking and Changing the batteries
•
PM05
:
Testing the HD-55 after closure
A
SSEMBLY OR REPLACEMENT OF THE ESSENTIAL PARTS OF HEAVY LOAD RELEASING SYSTEM OF
THE
FSR
TYPE SHALL BE PERFORMED BY SKILLED PERSONNEL
.
D
ISMANTLING AND RE
-
ASSEMBLY OF THE VARIOUS PARTS MUST BE PERFORMED IN A CLEAN AREA
.
L
UBRICATE PARTS WHICH HAVE BEEN CLEANED WITH A GREASE GRADE SUITABLE FOR
UNDERWATER MECHANICAL
JOINTS
(
E
.
G
.:
CASTROL
SPHEEROL
T6
GRADE
NLG12
FOR WET
ENVIRONMENT
).
N
UTS AND BOLTS MUST BE FITTED WITH NEOPRENE GLUE
.
DO
NOT
USE
STRONG
THREAD
LOCK
GLUE
AS THIS MAY LEAD TO JAMMING PROBLEMS
THE NEXT TIME THE EQUIPMENT WILL BE DISMANTLED
.
F
OR MAINTENANCE PURPOSES
,
THE UNIT MUST NOT BE IN ARMED POSITION
.
MU-HD55P&L-AN-001 Ed. G – October 2013
15