background image

Notice

Please read this manual carefully and thoroughly before you run this unit.

When the air cooler is working, pay attention to not allow welding or other 

igniting sources near it.

Power outlet must have a ground wire  not less than 1.5mm thickness in order to 

ensure effective grounding of air cooler.

Supply voltage deviation should be within  the rated voltage 

±

10V. Voltage being 

too low or too high for a long time could easily damage to air cooler. 

The air cooler should be used in an environment with adequate ventilation.

Activate the brake of castors when the air cooler is working to prevent it from 

moving.

The water pump will automatically shut off when the air cooler is running low on 

water. Turn off the air cooler before adding water. The water should not exceed the 
maximum water level.

Do not insert any object into the air outlet.

Cut off the power before conducting routine maintenance.

Drain water and clean water tank every day to ensure fresh air and odor.

Clean air filter and cooling pad regularly using soft brush and water.

Dry the water tank, air filter and cooling pad before stocking the unit.

1

Cooling principle

    The 3-step air cooling process is very simple
1.)A simple air moving system pulls fresh outside air and drives it through the moist 
pads. (The water / air cooling pads have replaced bed sheets.)
2.)The water in the pads evaporate, bringing down the temperature of the air passing 
through the pads.
3.)The blower then blows the cool air into the room.
Evaporation takes place throughout the day. For example, we perspire in hot weather 
and the water vapor produced by sweating takes the heat away from our body as it is 
exposed to air. Whenever dry air passes over water, the water is absorbed by the air. 
That  is why evaporative cooling naturally occurs near waterfalls, rivers, lakes and 
oceans. The hotter the air, the greater is the water absorption.  

Staff accommodation or home

Production unit in factories

Open-type shop, supermarket, restaurant and other commercial establishments.

BBQ party and other entertainment place

Outdoors

Offices, hotels and exhibition halls

 Schools, hospitals, gyms and large spaces

 Military camps, warehouse and other industrial applications

Applications

Summary of Contents for AIRBLASTER-2

Page 1: ...EVAPORATIVE AIR COOLER INSTRUCTION MANUAL AIRBLASTER 2 Please read this manual carefully before initial use...

Page 2: ...Preface Thank you for purchasing our new generation evaporative air cooler Please read this manual thoroughly before initial use...

Page 3: ...Table of Contents Notice 1 Cooling principle 1 Applications 1 Operation 2 Wiring diagram 3 Installation and disassembly 4 Water in out diagram 5 Technical parameter 5 Troubleshooting guide 6...

Page 4: ...g pad regularly using soft brush and water Dry the water tank air filter and cooling pad before stocking the unit 1 Cooling principle The 3 step air cooling process is very simple 1 A simple air movin...

Page 5: ...orresponding air flow speed indicator light will be displayed 4 Swing L R Press this button once and the auto left and right swing will be activated Press this button again to cancel cancel 5 Ionizer...

Page 6: ...Wiring diagram 3 Fig 3...

Page 7: ...e front side of the unit Fig 5 3 Fix the castor frames on the bottom of the water tank using a philipps screwdriver with the provided screws Tighten the screws with a screwdriver Fig 6 Installation of...

Page 8: ...ards Water inlet outlet diagram Technical parameters Fig 10 Fig 11 Fig 12 Fig 13 Model AIRBLASTER 2 3 Air volume m h 6000 Blast pressure pa 60 Input power W 350 Voltage frequency V Hz 220 240V 50 60Hz...

Page 9: ...OFF button after plugging the unit into the socket Cool function not working 1 Not enough water in water tank 2 Water pump is blocked 3 Cool button is not functioning 1 Add water to ensure there is en...

Reviews: