
Technical information
6 720 642 838 (2010/03)
14
6.3.2
Based on Greenline HE E6...E17
Fig. 10 Non-shunted and shunted heating and cooling circuit with buffer tank and passive cooling station. Heating water
passes through the cooling station during heating operation.
Circuit E11 and E12 is used both for heating and cooling.
Both circuits have room sensors, E11.TT and E12.TT,
humidity sensors, E31.RM1.TM1 and E31.RM1.TM2, and
room transducer for relative humidity and temperature
E11.TM and E12.TM (dew point sensor). The humidity
sensors are connected to the cooling station via a
condenser switch, E31.RM1.
Room transducer for relative humidity and temperature
E11.TM (dew point sensor) is connected to the cooling
station. E12.TM is connected to the heat pump circuit
board for circuit 2 (XB1).
6 720 641 553-03.1I
The system solution also applies to
Greenline HC, with an integrated hot water
heater (E41).
Summary of Contents for PKS 1000
Page 35: ...6 720 642 838 2010 03 35 Notes...