is forbidden.
Under no circumstances do not touch the
•
rotating cutting blade with your hands
Do not operate the circular saw overhead
•
When supply water, do not let water inpour into
•
motor, because it will result in electric shock.
Installation and adjustment of
circular saw elements
Before carrying out any works on the power tool it
must be disconnected from the mains, stop supply
water and choose a no damp or wet locations to
operate as follows.
Replacement of diamond cutting blade
Put the tool on the end of the electric motor
1.
case.
While holding the outer
2.
flange (9) with the flange
wrench (14), unscrew the
cutting blade fixing bolt
(8) with the help of the
wrench (13)
Replace the cutting blade (7). When mounting
3.
the cutting blade (7) please make sure that the
diameter of the seat bore
matches the diameter of
the ridge on the inner
flange. Clean the spindle
and washer fully. The
middle of washer (A) and
(B) should be against each
side of diamond cutting
blade.
Mount the outer flange (9) and, while holding
4.
it with the flange wrench (14), tighten the cutting
blade fixing bolt (8) with the help of the wrench
(13).
When tightening the screw fixing saw
blade (8), do not apply too great a force,
as this may damage the thread joint.
Only diamond cutting blade inside
diameter of 20mm can be used, other
products are improper.
Water supply installation
When cut or line concrete, tile or stone, must
supply water.
Install the stopple
Loose the clamping screw for cutting dept,
•
adjust the base set to bottom, then fix it with
clamping screw.
As arrowhead point, put the stopple through
•
inboard of link for cutting depth, then fix it to dentoid
cover of the support with mechanical screw.
Install the PVC pipe to the PVC pipe joint of the
•
stopple.
Adjustment of feedwater quantity
Turn the stopple pole to the left or right can adjust
feedwater quantity. When turn the stopple pole to
inboard of the PVC pipe joint, the stopple open fully.
When turn 90 degree to the left, the stopple will
close fully and shut off water.
Use sweet water
Plug the stopple into the PVC soft pipe.
•
Install the rubber jointer to cock, then put the
•
PVC soft pipe through the rubber jointer.
Turn on cock to the position where rubber jointer
•
will not fall. You can adjust feedwater quantity by
the stopple pole.
When use flume, must place it on the position
which is 80cm high or more above the workplace.
Initial operation
Always use the correct supply voltage:
the power
supply voltage must match the information quoted
on the tool identification plate.
Switching On/Off
Switching on:
To switch the machine on,
keep the lock-off button
(11) depressed and press
the on/off switch (2)
Switching off:
To switch the machine off,
release the on/off switch
(2)
Summary of Contents for CMS-110
Page 28: ...28 Notes Bemerkung Примечания Ескертулер Annotazioni ...
Page 29: ...29 Notes Bemerkung Примечания Ескертулер Annotazioni ...
Page 30: ...30 Notes Bemerkung Примечания Ескертулер Annotazioni ...
Page 31: ...31 Notes Bemerkung Примечания Ескертулер Annotazioni ...
Page 32: ...Via cantonale 2 CH 6917 Barbengo Switzerland mail info ivt ht com web www ivt ht com Swiss SA ...