22
4. Installation and Initial Start-Up
Press the
[Next]
button to acknowledge the self-test.
Before the first firing, the firing chamber should be dehumidified using the dehumidification program (see Chapter
5.4 for details).
Please note that the furnace may require a certain acclimation time after having been set-up. This is particularly
true if the furnace was exposed to substantial temperature changes (water condensation).
Summary of Contents for Programat CS3
Page 1: ...1 Programat P710 Operating Instructions Valid from software V4 0 ...
Page 2: ...2 ...
Page 89: ...89 ...
Page 90: ...90 ...
Page 91: ...91 ...