5
5201335 REV A
IQ POWER BPS-C POWER SUPPLY
4. INSTALLATION
NOTE
– DO NOT USE standard Ethernet cables with IQ Power systems.
Avoid permanent equipment damage by using only Simco-Ion modular
cables. (Refer to Section 8, Parts and Accessories).
Figure 1. IQ Power Crossover Modular Cable (black)
Mounting and Grounding
1. Locate power supply at a convenient place within reach of the high voltage cable
from the Conveyostat and visible to the machine operator. Power for the AC
adapter (if used) and an electrical ground connection must be available for the
BPS-C. The Conveyostat must be grounded for operation.
2. Secure power supply to the mounting surface (commonly a machine frame)
using M5 or M4 [#10 or #8] hardware (not supplied).
3. Locate AC adapter (if used) at a convenient place within reach of the power
supply.
4. Install AC Adapter (if used) by cleaning back of adapter and mounting surface
with alcohol. Allow alcohol to dry. Secure AC adapter to mounting surface with
two self-adhesive mounting pads.
NOTE
– Do not apply line voltage to the AC adapter until installation is
complete. Also, ensure that all input power switches are in the OFF (0)
position.