2 Model VJC Installation Check Sheet
2.1 Model VJC installation check sheet
[ ]
Inspect pump for shipping damage. Note the damage on the receipt and freight bill. Make a
claim to transportation company.
[ ]
Study Installation, Operation and Maintenance Manual (IOM) prior to operation.
[ ]
Check for free operation of pump shaft. Adjust the impeller if binding is found. Refer to IOM in
1c.
[ ]
Connect the pump to foundation and piping. Piping must not add any strain to the pump.
[ ]
Disconnect the coupling or V-belt, and check the rotation of motor. (Incorrect pump rotation
will critically damage pump). Reconnect driver.
[ ]
Attach coupling guard and all other safety devices.
[ ]
Open the discharge valve to prime the pump. If oil, air, or water leaks from the column pipe or
fittings, close the discharge valve and determine the cause of the leak before operating of the
pump.
[ ]
Run the pump at proper speed and hydraulic operating point.
2 Model VJC Installation Check Sheet
10
Model VJC Installation, Operation, and Maintenance Manual
Summary of Contents for VJC
Page 1: ...Installation Operation and Maintenance Manual Model VJC ...
Page 2: ......