4 General
4.1 General
4.1.1 Introduction
This instruction manual is intended to assist those involved with the installation, operation and mainte-
nance of Goulds' SPD slurry pumps. It is recommended that this manual be thoroughly reviewed prior to
installing or performing any work on the pump or motor.
4.1.2 Importance of instructions
The design, material, and workmanship incorporated in the construction of Goulds' pumps makes them
capable of giving long, trouble-free service. The life and satisfactory service of any mechanical unit, how-
ever, is enhanced and extended by periodic inspection and careful maintenance. This Instruction Manual
was prepared to assist operators in understanding the construction and correct methods of installing, op-
erating, and maintaining these pumps.
Study thoroughly Sections
5.1 Installation Instructions-Vertical Pumps on page
6.1 Starting a vertical pump on page 22
7.1 Operating and Maintenance Instructions on page 24
and carefully follow the instructions for installation and operation. Sections V, VI, VII and VIII are answers
to trouble and maintenance questions.
Keep this instruction manual handy for reference. Further information can be obtained by contacting the
Slurry Pump Division, East Centre St., Ashland, PA 17921 or your local representative.
4.1.3 Special warnings
Goulds' Slurry Pump Division will not be liable for any damages or delay caused by failure to comply with
the provisions of this Instruction Manual. This pump is not to be operated at speeds, working pressures,
discharge pressures, or temperatures higher than, nor used with liquids other than stated in the original
order acknowledgement, without written permission of the Slurry Pump Division, Goulds Pumps, Inc.
4.1.4
Receiving and inspection - shortages
Care should be taken when unloading any Goulds' pump. If shipment is not delivered in good order and
in accordance with the bill of lading, note the damage and shortage on both the receipt and freight bill.
Make any claims to the transportation company promptly.
Instruction sheets on various components as well as the Instruction Book for the pump are included in
the shipment. Do not discard.
4.1.5 Preservation and storage
Gould's Slurry Pump Division's normal domestic shipping and storage preparation is suitable for protect-
ing the pump during shipment in covered trucks. It also provides protection during covered storage at the
job-site and for a short period between installation and start-up.
One approach is to provide special preservatives and wrapping before shipment. However, after installa-
tion, the protective wrappings will have to be removed. Therefore, application of preservatives after in-
stallation is considered good practice. Hand rotation of the shaft is recommended every 30 days to pre-
vent damage to the bearings.
If the pump is to be idle and exposed to the elements for an extended period, either before or after instal-
lation, special precautions are required. Preservative treatment of bearings and machined surfaces will
4 General
12
Model VJC Installation, Operation, and Maintenance Manual