14
AF (6-36) IOM
INSTALLATION AND OPERATION CHECKLIST
Model AF
COMPLETE INITIAL DESCRIPTION
PAGE NO.
Manual read and understood
1~69
Level
foundation
15
Level subbase
15 ~ 19
Check motor rotation ---CW ---CCW
29
Component rough alignment complete
21 ~ 28
V-belt tension and alignment per drive mfgr. 21
Coupling alignment per cplg mfgr.
23
Piping installed and alignment rechecked
21,22,36
Mech. seal adjusted per mfgr.
Mfgrs Mnl
Seal flush connected
33,34
Impeller alignment and clearance set
Inch/Side 26 ~ 28
Pump shaft-free turning
32
Bearing types and lubrication
12,32,39
V-belt
or
coupling guards installed
60,61
Motor electrical connections
Mfgrs Mnl
Summary of Contents for Goulds Pumps AF
Page 1: ...Installation Operation and Maintenance Instructions Model AF 6 36 MXR Bearings ...
Page 3: ...AF 6 36 IOM 6 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 5: ...AF 6 36 IOM 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 14: ...10 AF 6 36 IOM THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 32: ...28 AF 6 36 IOM ...
Page 34: ...30 AF 6 36 IOM THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 48: ...44 AF 6 36 IOM THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...62 AF 6 36 IOM AF SECTIONAL shown with optional restrictor bushing adapter Fig 77 ...
Page 68: ...64 AF 6 36 IOM AF OPTIONS Fig 78 351 370F 126 ...
Page 69: ...AF 6 36 IOM 65 MXR BEARING CONFIGURATIONS 1MXR 3MXR 4MXR 6MXR Fig 79 540C 6 ...
Page 72: ...68 AF 6 36 IOM THIS PAGE INTENTIONALLY LEFT BLANK ...