Table of contents
.....................................................................................
1.1 Target groups..................................................................................... 6
1.2 Additionally applicable documentation............................................... 6
1.3 Warning signs and symbols................................................................ 7
1.4 Technical terms.................................................................................. 8
2.1 Intended use..................................................................................... 10
2.2 Improper use.................................................................................... 10
2.3 Risk assessment.............................................................................. 11
2.4 Safety instructions............................................................................ 12
2.4.1 Product safety................................................................................ 12
2.4.2 Obligations of the operator............................................................ 13
2.4.3 Obligations of the personnel.......................................................... 14
2.4.4 Laws, guidelines and standards.................................................... 14
2.5 Special hazards................................................................................ 14
2.5.1 Potentially explosive area.............................................................. 15
2.5.2 Hazardous pumped medium......................................................... 15
2.5.3 Concentration of natural radioactivity............................................ 15
...........................................................................
3.1 Labelling........................................................................................... 16
3.1.1 Type plate...................................................................................... 16
3.1.2 Type designation........................................................................... 17
3.2 Structure........................................................................................... 17
3.3 Shaft seals........................................................................................ 19
3.3.1 Slide ring seal................................................................................ 19
3.4 Auxiliary operating systems.............................................................. 20
3.5 CIP/SIP cleaning (Cleaning/Sterilisation in Place)........................... 20
............................................................................
4.1 Transportation.................................................................................. 21
4.1.1 Unpacking and checking the condition of contents....................... 21
4.1.2 Lifting............................................................................................. 21
4.2 Preservation..................................................................................... 23
4.2.1 For storage periods less than 3 months........................................ 23
4.2.2 For storage periods longer than 3 months (maximum 3 years)..... 23
4.3 Storage............................................................................................. 24
4.4 Removing preservative..................................................................... 24
...................................................................
5.1 Preparing the pump unit................................................................... 26
5.1.1 Preparing the pump....................................................................... 26
5.1.2 Fitting the heat insulation (optional)............................................... 26
5.1.3 Fitting the coupling........................................................................ 27
5.1.4 Installing the motor on base plate.................................................. 28
5.2 Preparing for installation................................................................... 28
5.2.1 Checking the ambient conditions................................................... 28
5.2.2 Preparing the installation site........................................................ 28
5.2.3 Preparing the foundation and base............................................... 29
5.3 Positioning the pump unit on the foundation.................................... 29
5.3.1 Placing the pump unit on the foundation....................................... 30
5.3.2 Aligning the base plate.................................................................. 30
Table of contents
Type SLH-4G, SLHS-4G
3
01/2016 JPB Rev. 5