5.2.3 Preparing the foundation and base
For installation on a concrete foundation, please consult with ITT
Bornemann GmbH.
Ensure that the foundation and base fulfils the following requirements:
n
Level: Permissible deviation
dimensioned drawings, pump oper-
ating instructions,
n
Clean (no oil, dust or other contaminants),
n
Service weight of the system and all operational forces can be
absorbed,
n
the stability of the pump system is ensured.
5.3 Positioning the pump unit on the foundation
For installation on a concrete foundation, please consult with ITT
Bornemann GmbH.
The pump may only be mounted on a base plate (steel frame).
NOTICE!
Property damage due to base plate tension!
–
A tensioned base plate may prevent coupling alignment and
result in pump damage.
–
Base plate on level foundation only and fasten as follows.
–
It is essential to observe the alignment tolerances.
Installation and connection
Type SLH-4G, SLHS-4G
29
01/2016 JPB Rev. 5