Fig.  14-Guicling  Circuit Breaker  into  Housing 

2. 

With the use of  the drawout handle,  back the 

breaker  into  the  housing  so  that  the  guide  bar  on 

the  breaker  enters  the  guide  slot  in  the  housing. 

Push breaker toward rear until breaker reaches the 

floor  stop  which  latches  it  in  the  "TEST"  position. 

If 

it  is  desired  to  test  the  breaker  for  operation 

electrically  and  manually  before  putting  it  into 

service,  it  may  be  done  in  this  position  by  means 

o

� 

the  push  button  on  the  front  of  the  breaker, 

F1g.  13  and  by  means  of  the  maintenance  handle 

as shown  in Fig. 

15. 

3. 

Seat  the  levering  device  pin  into  the  notch 

at  the  front  of  the  floor  guide  and  connect  the 

link  to  the  bracket  on  the  circuit  breaker  as  in 

Fig. 

16 

with the  breaker  in  the  "OPEN"  position, 

move  the  release  lever  toward  the  guide  slot  with 

the  right  foot  and  operate  the  levering  device 

through  one  stroke  until  the  breaker  engages  the 

stop  in  the  housing.  Turn  locking  device  to 

"LOCK"  position. Breaker is now in the "RACKED­

OUT"  position.  Discohnect  the  levering  device 

from  the  breaker.  Rack  in  by  inserting  the  crank 

and  turning  clockwise,  Fig.  17,  until  pointer  on 

breaker  panel  indicates  the  breaker  is  in  the  con­

nected "OPERATING"  position,  Fig. 

18. 

REMOVING  5HV-150  AND  5HV-250 
BREAKER  FROM  HOUSING 

1. 

Trip  breaker  by  means  of  the  control  switch 

on front  of  housing. 

IB-5909 

Fig.  15-Manually  Closing  Circuit Breaker 

While  in Test Position 

2. 

Open  door,  insert  crank  and  rack  breaker, 

Fig. 

17, 

to  "RACKED-OUT"  position  as  indicated 

by  pointer  on  breaker  nameplate. 

If  it is  desired to remove the breaker  completely 

from  the  housing,  continue  as  follows: 

a.  Move  locking  device  to  "UNLOCK"  posi­

tion  as  shown  in Fig.  13. 

b.  Seat the levering device pin into the notch 

at  the  front  of  the  floor  guide  and  connect  the  link 

to  the  bracket  on  the  circuit breaker as  in Fig. 

16. 

Operate  the  levering  device  through  onE  ;troke 

forward  until  the  floor  stop  latches  the  breaker  in 
the  "TEST"  position. 

c.  Remove  the  levering  device  and  apply 

drawout  handle  to  front  wheels.  Move  the  release 

lever  toward  the  guide  slot  with  the  right  foot  and 

draw  the  breaker  from  the  housing  as  shown  in 

Fig. 

19. 

5HV -350  CIRCUIT  BREAKER  . 

This  circuit  breaker  has.  "TEST"  and  "OPER­

ATING"  positions  which  correspond 

to 

those  of 

the  other 

5HV 

breakers,  but  since it is constructed 

differently,  it  is  moved  from  one  to  the  other  by 

different  means.  For  details  of  the  construction  of 
the  breaker,  see  the 

SHV-350 

Circuit  Breaker 

Instruction  Book  listed  in  the  Bibliography  at  the 

end of these  instructions. 

11 

-

www 

. ElectricalPartManuals 

. com 

Summary of Contents for 5HV-150

Page 1: ...PE 5HV 75 5HV 150 5HV 250 AND 5HV 350 METAL CLAD SWITCHGEAR 1 t i t I 5000 VOLT 1200 2000 AND 3000 AMPERE i 1 i x rt i y t l l 1 T E CIRCUIT BREAKER COMPANY PHILADELPHIA 30 PENNSYLVANIA PRINTED IN U S A 7 59 2M w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 2: ... Inspection 7 STANDARD CONSTRUCTION Shutters 7 Bus Insulation 8 Primary Disconnecting Device 8 Secondary Disconnecting Devices 8 Ground Bus and Contacts 9 Control Wires 9 5HV 75 5HV 150 AND 5HV 250 CIRCUIT BREAKERS General 9 Installation and Removing from Housing 10 SHV 350 CIRCUIT BREAKER Installation and Removing from Housing 13 HOW TO PUT THE SWITCHGEAR IN SERVICE General 14 Safety Precautions ...

Page 3: ... once The 1 T E Circuit Breaker Company is not re sponsible for damage after delivery of shipment to the carrier However if the company is notified of such claims it will furnish forms to facilitate securing any adjustments If damage to the ship ment indicates rough handling claim for damage should be filed at once with the carrier and the I T E Circuit Breaker Company promptly notified The switch...

Page 4: ... Switchgear Raised Rollers and Channels in Place Prior to Lateral Moving Fig 2 Switchgear Lowered on Rollers Prior to Moving Onto Track Timber Fig 4 Method oF Applying Rollers as Switchgear Progresses Onto Track Timber Fig 6 Jaclcs Removed and Switchgear Ready For Lateral Moving V _ ii J ff jFfft tl _ w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 5: ... the lower flange of the sill be shimmed to proper height Temporary bolts should be inserted in all tapped holes while grouting to prevent filling or damage to the threads Where necessary power and secondary con trol conduits should be installed before the in stallation of the housings Available space for the conduits is given on the floor plan accompanying each order These conduits should not ext...

Page 6: ...f the pothead with wiping sleeve the lead sheath should extend into the pot head for one inch minimum bell over the end of 6 the sheath and add a stress relief cone if required Clean the sheath about three inches beyond the end of the cone and apply stearine flux to end of the cone and the sheatlt Wipe the joint in the usual manner On inverted potheads the lead sheath should be extended down into ...

Page 7: ...AS POTENTIAL IB 5909 TRANSFORMERS ARE CONNECTED DURING THE TESTS 4 Check continuity of all circuits A great deal of this work can be done after the circuit breakers are installed by energizing the control source and operating the equipment with the main circuit dead Indicating instruments check the continuity of current transformer and potential transformer circuits after the main circuit is energ...

Page 8: ...ing Device fingers tends to increase the contact pressure dur ing a short circuit All contact finger springs are outside the current path The stationary disconnecting device is rigidly mounted in an insulating molding of cylindrical shape located within the main bus housing See Fig 8 For the SHV 350 housing the disconnecting device is similar but mounted in a molding of rectangular outline SECONDA...

Page 9: ...ERATING positions Inserting the crank in the center hole and turning to the limit in the counter clockwise direction moves the pointer and racking bar from the connected OPERATING position out to the RACKED OUT position Turn ing the crank to the limit in the clockwise direction moves the pointer and the racking bar on the breaker into the connected position The maintenance handle is used to close ...

Page 10: ...I w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 11: ... the drawout handle back the breaker into the housing so that the guide bar on the breaker enters the guide slot in the housing Push breaker toward rear until breaker reaches the floor stop which latches it in the TEST position IO Fig 13 5HV 150 and 5HV 250 Racking and Indicator Assembly Unlock Position If it is desired to test the breaker for operation electrically and manually before putting it ...

Page 12: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 13: ...ed OPERATING position Fig 18 REMOVING 5HV 150 AND 5HV 250 BREAKER FROM HOUSING 1 Trip breaker by means of the control switch on front of housing IB 5909 Fig 15 Manually Closing Circuit Breaker While in Test Position 2 Open door insert crank and rack breaker Fig 17 to RACKED OUT position as indicated by pointer on breaker nameplate If it is desired to remove the breaker completely from the housing ...

Page 14: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 15: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 16: ...r fo Raclced Oul Position 1 t Fig 18 Circuit Brealcer in Fully Connected Position 12 Fig 17 Racking in Circuit Brealcer to Fully Conneded Position i Fig 19 Pu ling Out Circuit Breaker from Housing w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 17: ...ease lever and rack the breaker to the OPERATING position as shown in Fig 21 IB 5909 Fig 21 Raclcing in SHV 350 Breaker to Fully Connected Position REMOVING 5HV 350 BREAKER FROM HOUSING 1 Trip the breaker by means of the control switch 2 Open the compartment door insert the rack ing rod push down on the racking release lever and rack the circuit breaker out to the rEST position as indicated by the...

Page 18: ... J w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 19: ...ave been placed in the test position Close all doors to the switchgear as a safety measure Those breakers necessary to energize the main bus should be moved to the connected position and closed Observe undervoltage relays or other devices that should function properly when the main bus is energized Next move each circuit breaker in turn to the connected position and close Method explained under IN...

Page 20: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Reviews: