MEASUREMENT AND ASSEMBLY MANUAL 

Manual validity: 01.02.2015 

INSTALLATION OF GUIDE RAILS 

Proper method of installation of guide rails to the box depends on the box model used. 

The guide rails are supporting elements of the while system. 

 

Only one model of guide rails 

– type A30 – is available for the ZIP ECO. 

The rail is supplied with pre-drilled holes, always from the front. 

The holes are arranged as follows: 

 

Outer holes are located approx. 15 cm from the rail edge;

 

 

Intermediate holes are located evenly and spaced 50

–80 cm along the guide rail length. 

 

 

A) 

B) 

 

The ZIP ECO guide rails consist of two parts: the basic supporting bar and the plastic inner rail in which the zipper moves.  

A)  Aluminium guide rail; 

B)  Plastic guide rail. 

 

1. 

Insert the guide rails in the side piece mandrel, check if height of the guide rails is the same. 

2.  Cut the plastic guide rail to size, with the edge perfectly right-angled. After cutting the inner plastic rail, both upper 

edges of the profile should be bevelled as shown above, to prevent rubbing of the fabric against the sharp edge during 

the use. 

3.  Insert the plastic guide rail B) from below and close the profile with the metallic plug of the guide rail. 

4.  Place the whole roller blind with the guide rails to the place of intended installation. 

5.  Indicate  the  drilling  points  where  the  roller  blind  will  be  attached  by  screws  (size  according  to  the  wall  material  and 

screws used). 

6.  Attach the guide rails to the wall (frame) using screws suitable for the underlying structure (metallic frame, cement, 

brick, etc.).

 

 

Summary of Contents for ZIP ECO

Page 1: ...n front of an opening As a rule indicate the width of the opening which is to be shaded in the order form 2 x 40 mm Dimensions outside the stipulated limits must be consulted with the manufacturer H h...

Page 2: ...enting the penetration of water and protecting all electrical components Power supply Electric power mains 230 v ac Frequency 50 60 hz Voltage fluctuation tolerance 10 Interference level below 70 db O...

Page 3: ...scaffolds balconies etc or at elevated bridges If it is impossible to use such facilities suitable individual protection means must be used The scaffolds platforms and elevated working areas must be e...

Page 4: ...e using portable drills and screwdrivers 2 Roller blind installation to a frame or wall 3 Connection to power mains 4 Adjustment of end stops motor limit switches etc and testing of the roller blind P...

Page 5: ...zipper moves A Aluminium guide rail B Plastic guide rail 1 Insert the guide rails in the side piece mandrel check if height of the guide rails is the same 2 Cut the plastic guide rail to size with the...

Page 6: ...s together with the control unit in all situations where there is more than one device to control the same roller blind The control unit will store the provided impulse for approx 3 minutes or until r...

Page 7: ...brown phase neutral conductor yellow green ground Motor switching can be installed in two different ways either using a switch or using a programming set on request The instructions for programming an...

Page 8: ...eed assistance contact your dealer and ask for original spare parts DISASSEMBLY DISPOSAL As regards Directive 2002 95 EC RoHS on the use of lead chrome cadmium and other substances hazardous to enviro...

Page 9: ...tape directly onto the winding drum on the side opposite to where the fabric is moving Repeat applying further adhesive tape layers until the defect is completely removed Drum cover displacement If th...

Page 10: ...ng operation Otherwise contact technical support Increased noise Motor failure Disconnect the motor test it and replace if necessary Motor blocks after a long period of service The motor is in the the...

Reviews: