MEASUREMENT AND ASSEMBLY MANUAL 

Manual validity: 01.02.2015 

SCREEN ZIP ECO

 

1. MEASURE-TAKING 

The SCREEN ZIP ECO roller blinds can be placed into an opening or in front of it, and attached to the ceiling or wall. 

 

The screen roller blind width and height shall be measured as follows: 

…… (width) 

a) attachment into an opening: 

Measure the actual opening width in three points, indicate the lowest 

dimension measured in the order 

form. 

b) attachment in front of an opening: 

As a rule, indicate the width of the opening which is to be shaded in the 

order 

form + 2 x 40 mm. 

Dimensions outside the stipulated limits must be consulted with the manufacturer. 

H …… (height) 

Measure the overall height including the roller blind upper section 

 

Dimensions outside the stipulated limits must also be consulted with the manufacturer. 

SIDE GUIDING: 

The  SCREEN  ZIP  roller  blind  is  equipped  with  a  special  application  for  the  attachment  of  the  screen  fabric  by  the  ZIP 

system, allowing its perfect attachment, tension and guiding in the guide bars. Thanks to this feature the roller blind is very 

stable and wind-proof. 

Summary of Contents for ZIP ECO

Page 1: ...n front of an opening As a rule indicate the width of the opening which is to be shaded in the order form 2 x 40 mm Dimensions outside the stipulated limits must be consulted with the manufacturer H h...

Page 2: ...enting the penetration of water and protecting all electrical components Power supply Electric power mains 230 v ac Frequency 50 60 hz Voltage fluctuation tolerance 10 Interference level below 70 db O...

Page 3: ...scaffolds balconies etc or at elevated bridges If it is impossible to use such facilities suitable individual protection means must be used The scaffolds platforms and elevated working areas must be e...

Page 4: ...e using portable drills and screwdrivers 2 Roller blind installation to a frame or wall 3 Connection to power mains 4 Adjustment of end stops motor limit switches etc and testing of the roller blind P...

Page 5: ...zipper moves A Aluminium guide rail B Plastic guide rail 1 Insert the guide rails in the side piece mandrel check if height of the guide rails is the same 2 Cut the plastic guide rail to size with the...

Page 6: ...s together with the control unit in all situations where there is more than one device to control the same roller blind The control unit will store the provided impulse for approx 3 minutes or until r...

Page 7: ...brown phase neutral conductor yellow green ground Motor switching can be installed in two different ways either using a switch or using a programming set on request The instructions for programming an...

Page 8: ...eed assistance contact your dealer and ask for original spare parts DISASSEMBLY DISPOSAL As regards Directive 2002 95 EC RoHS on the use of lead chrome cadmium and other substances hazardous to enviro...

Page 9: ...tape directly onto the winding drum on the side opposite to where the fabric is moving Repeat applying further adhesive tape layers until the defect is completely removed Drum cover displacement If th...

Page 10: ...ng operation Otherwise contact technical support Increased noise Motor failure Disconnect the motor test it and replace if necessary Motor blocks after a long period of service The motor is in the the...