DOC. MIE11110 Rev. 5
Page 84 of 110
5. Same LTC as above; fault on this selection.
1.3.4 PT tests: PT ratio test
•
Connect low V to the transformer HV side phase 1 and 2.
•
Adjust the voltage of V1 to 100 V.
•
Connect the measuring input Ext V (the 600 V or the 10 V
input, as a function of the transformer ratio) between one
phase and ground. You will find that two outputs have half
Summary of Contents for T2000
Page 1: ...DATE 18 11 2009 DOC MIE11110 REV 5 T 2000 APPLICATION GUIDE ...
Page 45: ...DOC MIE11110 Rev 5 Page 45 of 110 ...
Page 81: ...DOC MIE11110 Rev 5 Page 81 of 110 2 Selection time about 30 ms LTC fails ...
Page 83: ...DOC MIE11110 Rev 5 Page 83 of 110 4 Same LTC as above fault on this selection ...
Page 91: ...DOC MIE11110 Rev 5 Page 91 of 110 The connection diagram is the following ...