INSTALLATION GUIDE
|
22
IM-Raptor-1.3.6-EN
To establish AC power connection with the power source turned off, follow the steps below:
For the following instructions, refer to Figure A: AC Wiring Diagram.
1. Remove the transparent plastic finger safe cover from the face of the terminal block.
If an AC power supply is installed in PS1, carry out steps 2 through 4.
2. Connect the ground from the first power source to GND1 terminal screw (pin 2).
3. Connect the Live from the first power source to the PWR1 V+/L terminal screw.
4. Connect the Neutral from the first power source to the PWR1 V-/N terminal screw.
If an AC power supply has been installed in PS2, perform steps 5 through 7.
5. Connect the ground from the second power source to GND2 terminal screw (pin 6).
6. Connect the Live from the first power source to the PWR2 V+/L terminal screw.
7. Connect the Neutral from the first power source to the PWR2 V-/N terminal screw.
To keep the wires from pulling loose, use a small flat-blade screwdriver to tighten the wire-clamp screws on the front of
the terminal block connector.
8. After wiring is completed, reinsert the transparent plastic finger safe cover back onto the face of the terminal block.
9. Connect pin 12 to the ground of the chassis.
6.3 Connecting DC Power
Figure B: DC Wiring Schematic
For 100-240 VDC rated equipment, an appropriately rated DC circuit breaker must be installed.
a.The specification for HV DC breaker is 5 A, 2P, 300 VDC (min) Circuit breaker, Thermomagnetic or equivalent type. A
recommended option for this circuit breaker is: Model No. CX2-B0-14-450-22A-13G, Molded Case Circuit Breaker, 2 P,
5 A, 250/500 VDC.
b.Wire gauge sizing is to be selected with appropriate design as per the Electrical code for a 60 W, 1-phase device.
Equipment must be installed according to applicable local wiring codes and standards.