Ste
6A.
Pul
the
Hei
Boo
dow
the
Ste
7A.
Rub
Wra
Hee
(31
sure
the
Hee
(9)
,
are
illus
ep 6
Installing
l and hold
bottom of
ght Scale
om (3)
in p
wn slightly
Knob (30
ep 7
Installing
bber Heel
ap a
Heel
el Holder
)
onto the
e the teeth
slots on th
el Holders
making su
slotted o
stration on
g the Adju
the
Spring
the
Bed F
e (44)
is jus
place by re
until the
S
)
into the b
g the Hee
Holders
Holder Br
(31).
Place
ends of t
h of the ho
he ends of
s (31)
onto
ure that the
on the e
the right.
3
stable Bo
g Knob (18
Frame (4)
a
st below
th
eleasing the
pring Kno
back side o
el Holder
racket (7)
o
e two
Rub
the
Front
lder bracke
f the rod. A
o the ends
e teeth of th
ends of th
0
AS
om To Th
8)
, and slid
as shown.
e bracket o
e
Spring K
ob (18)
“PO
of the brack
Brackets
onto each
ber Heel H
Rod (11)
,
ets are slo
Attach two
s of the
Re
he holder b
he rod. S
15
4
3
1
SSEMB
e Bed Fra
de the
Adju
Slide the b
on the bed
Knob (18)
OPS” into t
ket on the
To The
Rubber
Holders
making
otted into
Rubber
ear Rod
brackets
See the
8
BLY
ame
ustable Bo
boom upwa
d frame. Lo
and sliding
the locked
Bed Fram
44
oom (3)
in
ard, until
th
ock the
Adj
g the
Adju
position. F
me (4)
.
nto the squa
he desired
justable
ustable Bo
For added
are bracke
height on
oom (3)
up
safety, sec
et on
the
p or
cure
Summary of Contents for 5214.4-120616
Page 9: ...O OVERVI 7 IEW DR RAWING ...
Page 12: ...HARDWAR 10 RE TO OOLS P PACK ...