background image

STEP C

STEP  D

a. Mix  the  concrete  according  to the instru ctions on the bags. Note that
    a  thicker  mix  of  concrete  will  dry stro nger than a thin mix. Pour the 
    concrete into the hole, stopping  approximately 18 inches fro m the top
    of the hole.
b. Insert  the  four  pieces  of  Anchor

 R

ebar (P) into the  hole, pushing each

    piece  firmly  to  the  botto m  of  the  hole.  The  four  pieces  should  be
    arranged in a square approximately 8 inches wide so that each piece of
    rebar  will  be  positioned next to the J-Bolts when the  J-Bolt  Template
    is placed in the cement.
c. Finish  filling the hole to the top with concrete. The top of the concrete 
    should reach just above the level of the top of the form.

P

a. Positi on  the  J-Bolt  Template (O) over  the  hole  so  that  it  is centered,
     with the sides of the plate square with the sides of the hole.
b.Push  the  J-Bolts  (N)  into  the  concrete   until  the   J-Bolt  Template  is 
    restin g fla t against the surface of the concrete.
c. Grasp  the  tops  of  the   J-Bolts and agita te  the Template  assembly  back
    and forth repeatedly to eliminate any air bubbles in the concrete. Lift the 
    Template  slightly  above  the  concrete  when  agita tin g .  Make  sure  the 
    Template  is  restin g  on  the  concrete  afte r  agita tin g. Form  the concrete
    into a downward slope away from the Pole to allow water runoff.
d. Clean off  any concrete that may be on the J-Bolt Template or the exposed
    portions of the J-Bolts .
e. Using  a  carpenter

s level, make sure the Template is  square to and level

    with the playing surface.
f. Allow the concrete to cure  for  a  minimum of 5-7 days  before  installing
    the  rest   of  your  basketball  system.  In  cold  ,  wet   weather  or  humid 
    climates, allow additi onal tim e for the concrete to cure. 

minimum

YOU ARE NOW FINISHED WITH THE INITIAL ASSEMBLY STEPS. DO NOT PRO-

CEED WITH THE ASSEMBLY UNTIL THE CONCRETE HAS FULLY CURED .  CUR-

ING WILL TAKE A MINIMUM OF 72 HOURS. IN HUMID CLIMATES OR WET

WEATHER, ALLOW ADDITIONAL TIME FOR THE CONCRETE TO CURE.

!

!

WARNING

NEVER  USE  THE  SYSTEM  WITHOUT  FOLLOWING   THE  CEMENTING   INSTRUCTIONS .  FAILURE   TO
FOLLOW ALL OF THESE INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS PERSONAL  INJURY
OR PROPERTY DAMAGE AS LISTED ON PAGE ONE.

O

N

5

Summary of Contents for TRIPLE THREAT TPT-443

Page 1: ...E R S O N A L I N J U R Y FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY DO NOT ATTEMPT TO ASSEMBLE THIS S Y S T E M W I T H O U T C A R E F U L LY READING AND FOLLOWING ALL I N S T R U C T I O N S B E G I N B Y I D E N T I F Y I N G A N D T A K I N G INVENTORY OF ALL PARTS USING T H E PA R T S L I S T P R O V I D E D IRONCLAD SPORT...

Page 2: ...TRUCTIONS FAILURE TO FOLLOW THESE SAFETY INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID THE WARRANTY The owner must ensur e that all player s know and follow these rules to saf ely oper ate the sys tem Proper and com plete assem bly use and super vision is essent ial for proper oper ation and to reduce the risk of acci dent or injury A high probabi lity of ser ious inju...

Page 3: ...ion Arms D 1 H Frame Backboard Mount E 1 Spring Assist Cartridge F 1 Actuator Height Adjustment Device G 1 Rim Height Indicator H 1 Rim Height Sticker I 2 14mm x 12cm Hex Bolts J 2 14mm Lock Nuts K 4 16mm x 29cm Hex Bolts L 2 16mm x 26cm Hex Botls M 6 16mm Lock Nuts N 4 16mmAnchor J Bolts O 1 Anchor Template P 4 Anchor Rebars Q 8 Thick Washers R 8 16mm J Bolt Hex Nuts S 4 16mm Flange Nuts T 4 14mm...

Page 4: ...ehind the playing surface must be cleared off by at least 3 feet to enable the user to stand behind the pole to adjust the Rim height NOTE Before digging call to locate any buried utility lines NOTE At rim height 10 distance from the face of backboard to the front of Main Post A is as below TPT 443 36 TPT 553 36 TPT 554 48 Choose the proper location to dig for the concrete footing STEP B A Thread ...

Page 5: ...te the Template assembly back and forth repeatedly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure the Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bol...

Page 6: ... shown in FIGURE 1B C If the Main Post A is not exactly vertical adjust the 16mm J Bolt Hex Nuts R located under the Post base Tighten all of the Flange Nuts S when Main Post A is vertical NOTE Face the Main Post A with Actuator Bracket facing away from playing court as shown in FIGURE 1C 6 STEP2 A Slide the Main Extension Arm B over the top of the Main Post A and attach to the lower pivot tube wi...

Page 7: ...Plastic Rim Height Indicator G should hang freely along side the Spring Assist Cartridge E B Attach the bottom of Spring assist Cartridge E to the welded Actuator Bracket by using a 14mm x 12cm Hex Bolt I two 14mm Flat Washers T and a 14mm Lock Nut J C Remove and discard the blue plastic spreader tube from the Spring Assist Cartridge E STEP 5 A Attach the 2 Upper Extension Arms C to Main Post A wi...

Page 8: ...th the 10 mark on the Rim Height Sticker H C Attach Post Pad and Gusset Pad to Main Post A as shown A Attach the backboard to Main Extension Arm B by using a 16mm x 29cm Hex Bolt K two 16mm Flat Washers U and a 16mm Lock Nut M And then secure the Upper Extension Arm C to Backboard by using a 16mm x 26cm Hex Bolt L two 16mm Flat Washers U and a 16mm Lock Nut M A Insert the 4 Plastic and Steel Space...

Reviews: