background image

16653-G

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-800-577-9663

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

v

is

i

t b

a

cky

ard

in

st

a

l

l

er

.

c

o

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

c

a

n

 t

h

f

 ow

c

o

de 

t

a

p

ply

 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request

Answers to frequently asked questions

Live chat with an agent

Summary of Contents for VALUE CLASSIC 16653-G

Page 1: ...EAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live ...

Page 2: ...DC Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and official rules visit https backyardreviews net sweepstakes rules Scan QR code above Click write a review Find your product Tell us what you think Submit your review You ll be notified by e mail if you ...

Page 3: ...eded to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 9 CHECK ALL PARTS Inventory all parts listed on pages 7 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 3 4 for required and optional materials and quantities CONTACT OUR ...

Page 4: ... assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk G...

Page 5: ...nding on your specific site REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included x2 x8 2 x 4 x 10 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 3 7 6 cm hot dipped galvanized nails Op...

Page 6: ... latex exterior paint WOOD GLUE Exterior Rated CAULK 2 Tubes Use acrylic latex exterior caulk that is paintable 2 coats recommended DRIP EDGE Feet 50 15 ROOFING FELT Sq ft to cover 114 1 GALVANIZED ROOFING NAILS lbs For roofing felt For shingles 2 5 1 cm x3 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails NOTE Use a minimum of 5 8 1 6 cm Oriented Strand Board OSB 5 8 x 48 x 96 1 6 x 121 9 x 2...

Page 7: ...AF 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Used as a gauge block for 3 4 1 9 cm measurement x1 GAA AH x2 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 7 cm EU x2 19 32 x 2 1 2 x 17 1 6 x 7 6 x 43 2 cm DI x2 19 32 x 2 1 2 x 12 1 5 x 6 3 x 30 5 cm PARTS IDENTIFICATION AND SIZES Double letter part identification is stamped on some parts Check these locations for part stamp WOOD SIZE CONVERSION CHART Nominal Board Size...

Page 8: ...RTS LIST x1 x1 ROOF PANELS x1 Left x1 Right LIP EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE x2 x1 x1 3 8 x 23 9 16 x 48 1 x 59 9 x 121 9 cm 3 8 x 23 9 16 x 23 7 8 1 x 59 9 x 60 6 cm 3 8 x 23 9 16 x 23 7 8 1 x 59 9 x 60 6 cm x2 3 8 x 23 9 16 x 48 1 x 59 9 x 121 9 cm Loft panels are 7 16 1 1 cm thick x1 15 7 8 x 23 7 8 40 3 x 60 6 cm LOFT PARTS LIST x1 23 7 8 x 96 60 6 x 243 8 cm 2 x 3 x 96 5 1 x 7 6 x...

Page 9: ...wn for quicker assembly Length of nail must match screw length x4 3 4 1 9 cm x12 64 Metal Threshold x1 3 8 LOFT HDW SET 5 1 2 Hex bolt 2 flat washers lock nut x2 3 4 1 9 cm x8 x1 1 1 2 3 8 cm x2 Window x1 x2 x8 SHELVING PARTS LIST 2 x 3 x 10 5 1 x 7 6 x 25 4 cm 1 x 4 x 23 78 2 5 x 10 2 x 60 6 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 32 cm 1 x 4 x 96 2 5 x 10 2 x 243 9 cm 7 16 x 11 7 8 x 23 7 8 1 1 x 30 2 x ...

Page 10: ...xterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements 120 304 8 cm 89 226 1 cm 10 x8 304 8 x 304 8 cm 10 x8 304 8 x 304 8 cm 96 243 8 cm 153 11 16 476 1 cm 10 x 8 Building Requires 2 x 4 x 10 5 1 x 10 2 x 304 8 cm x2 2 x 4 x 8 5 1 x 10 2 x 304 8 cm x2 Ca...

Page 11: ...les in direct contact with ground For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS MATERIAL REQUIRED 4 x 4 x 8 10 2 x 10 2 x 304 8 cm Treated Lumber x3 Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lu...

Page 12: ...astener First secure at ends with one fastener Fig A 153 11 16 387 8 cm 153 11 16 387 8 cm LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed 2 BEGIN 1 Use a level and ensure the frame is level before applying floor panels Check for frame squareness by measuring ...

Page 13: ... surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT D O O R EAVE WALL EAVE WALL EAVE WALL GABLE WALL GABLE WALL Ensure the floor frame is level after installing floor panels Re level if needed ...

Page 14: ... x 8 3 x 170 2 cm OSB Place 1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header assembly over and nail as shown on the other side Flush Flush ...

Page 15: ...pposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm For squareness maintain 3 4 and 1 1 2 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 2x3 TEMP SPACER 3 4 GAUGE BLOCK GAA WALL PANEL INSTALLATION HINTS E...

Page 16: ...2 x 172 7 cm UM x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI RR UM UM TO RR SL AI x6 AL x5 Flush Flush Flush Flush Flush Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig A Secure with 2 3 nails at each connection and 4 3 nails at seams Fasten 3 middle parts AL to Pre Assembled Header with 2 3 screws Fig B F...

Page 17: ...0 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw 3 4 1 9 cm x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 11 7 8 x 84 panels flush to installed panels and 1 1 2 from the top plate Secure panels with 2 nails spaced 6 apart on edges Note the panel lip edge square edge orientation Flush Flush Flus...

Page 18: ... x 243 8 cm TP 24 61 cm 24 61 cm 24 61 cm 1 1 2 3 8 cm 72 182 9 cm 96 234 8 cm 120 304 8 cm 96 234 8 cm 78 1 2 199 4 cm RL TP RL TP AI x6 48 121 9 cm 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 3 7 6 cm Nails Seam Seam HINT Flush Flush Flush Flush ...

Page 19: ...op plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install the 48 x 84 and 23 7 8 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3...

Page 20: ... cm PARTS REQUIRED SZ SZ AI x3 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection 8 EAVE WALLS 3 7 6 cm x24 x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 3 7 6 cm Nails 2 x 4 x 89 5 1 x 10 2 x 226 1 cm SZ x4 Build TWO identical 8 walls HINT ...

Page 21: ...he top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install next 48 x 84 panel flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 48 x 84 121...

Page 22: ...cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 10 gable wall is now standing FINISH Use OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A ...

Page 23: ...t Angle nails into floor frame Fig C Nail panel to 10 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 8 eave wall is now installed FINISH 2 5 1 cm x18 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig C Secure wall to...

Page 24: ... apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through gable wall panel into 10 wall bottom and top plates Fig B Fig A Secure wall to bottom plate first ENSURE PANEL CORNERS ARE FLUSH 2 BEGIN 1 Remove temporary brace OO from installed 10 gable wall Place 2nd 8 eav...

Page 25: ...paced 6 apart Angle nails into floor frame Fig C Nail panels to eave wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH 2 5 1 cm x10 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig A Secure wall top plates with 3 screws at each corner at an angle Fig D 3 3 7 6...

Page 26: ...all doublers are now installed FINISH Fig A Secure from top with 2 3 nails spaced every 24 Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP DOOR Ensure all doubler seams are non aligned over seams of wall top plates JBD TJ TJ TP TP 3 7 6 cm Nails JBD 3 7 6 cm Screws 3 Secure from bottom with 2 3 screws at each corner Fig B Fig B 3 7 6 cm x8 2 x 4 x 20 3 8 5 1 x...

Page 27: ...lies with 1 gusset Fig B Build 3 rafter assemblies with 2 gussets Fig C BEGIN 1 2 3 FINISH Your rafters are now assembled RAFTERS PARTS REQUIRED 2 5 1 cm x96 x10 x8 6 x 24 15 2 x 60 9 cm 2 x 4 x 65 5 1 x 10 2 x 165 1 cm AD Flip over rafter assembly and fasten second gusset to other side with 2 nails FIg C Temporary support OO Flush at peak 120 304 8 cm Fit base of rafters in corners of back wall x...

Page 28: ...ds Check that you have the measurements shown Secure rafters with 2 3 screws angled at each end Fig A Fig B Secure rafters on opposite side 1 FINISH Your rafters are now installed BEGIN Rafter with ONE GUSSET facing inward Two Gusset Preassembled One Gusset Preassembled 3 7 6 cm x3 x2 Flush to outside of panel Flush to outside of panel Rafter with ONE GUSSET facing inward Fig A 3 7 6 cm Screws ang...

Page 29: ...k 2 Orient parts AF on the flat side as shown Measure and mark the center of the middle gable panel Secure with 1 1 2 nails spaced 6 apart along edge Place left panel on AF flush to installed gable panel and secure with 1 1 2 nails spaced 6 apart along edge Repeat STEP 2 for right panel Repeat STEPS 1 3 to build the 2nd gable unit 1 BEGIN 1 1 2 3 8cm x24 1 1 2 3 8cm Nails Flush Flush Install gable...

Page 30: ...rk 2 9 16 6 5 cm Measure and Mark Fig A 3 7 6 cm Screws Continue nailing lower edge of panels to wall doubler with 2 nails spaced 6 apart Continue securing panels to rafter with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws angled into each AF at an angle Fig A Measure 2 9 16 down from top plate doubler and mark at each side as shown Set gable unit on top plate Fasten wit...

Page 31: ...r move the panel side to side until the top corner is flush to the peak Fig B and there is a 1 2 measurement on the gable end rafter Fig C Secure panel with 1 2 nail in each corner 2 Place the 48 x 96 panel on rafters with a 1 2 measurement on the gable end rafter Fig A and with the panel flush at the peak Fig B Secure panel with 1 2 nail in each corner Two Nails 48 x 96 BEGIN 1 1 2 1 2 cm Gable E...

Page 32: ...after as shown Move to the top of the panel and keep spacing between the center of the rafters Secure panels with 1 2 nail into each rafter NOTE Measurements from inside of gable panels Install 23 1 2 x 96 roof panel flush to the installed panel and there is a 1 2 measurement on the gable end rafter Fig A Secure panel with 1 2 nail in each corner 3 2 5 1 cm Nails 23 1 2 x 96 Flush x1 23 1 2 x 96 5...

Page 33: ... installed Repeat steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside of the 48 wide panel 5 PARTS REQUIRED ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x82 ...

Page 34: ... is now installed Install front gable trim AUR and AUL flush to top of roof panel and flush at peak as shown Fig A Secure trim with 2 finish nails 7 1 4 apart BEGIN 1 Repeat above steps to secure the back wall gable trim FINISH 19 32 x 3 1 2 x 71 15 16 1 5 x 8 9 x 182 7 cm x2 AUR 19 32 x 3 1 2 x 71 15 16 1 5 x 8 9 x 182 7 cm x2 AUL ...

Page 35: ...gh roof panel into VF with 1 1 4 screws spaced approximately 7 1 2 apart as shown Screw through roof panel into WTC with 1 1 4 screws spaced approximately 7 1 2 apart Secure WTC and VF to gable trim with 2 3 screws into board ends Pre drill using a 3 32 drill bit Install WTC flush to edge of roof panel and flush to installed eave trim VF 1 x48 1 1 4 3 2 cm 3 7 6 cm x8 x2 2 x 6 x 48 5 1 x 15 2 x 12...

Page 36: ...all gable end 83 1 2 corner trim under gable panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 83 1 2 corner trim flush to eave soffit and flush along seam of installed corner trim Fig C Secure with 2 finishing nails spaced evenly 2 BEGIN 1 83 1 2 212 1 cm Fig B Flush to eave panel 3 8 x 1 3 4 x 83 1 2 1 x 4 5 x 212 1cm x8 Fig C Seam is fl...

Page 37: ...bled joist over and repeat staggered nail pattern Support joist and drill a 7 16 hole through each end Fig A PARTS REQUIRED LOFT JOIST ASSEMBLY x24 3 7 6 cm x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 4 x 24 5 1 x 10 2 x 61 cm RL x2 7 16 11 mm Drill Bit Orient parts TP and RL on a flat surface Hold parts TP and RL flush and aligned BEGIN 1 Fig A Flush 3 7 6 cm Nails ...

Page 38: ...s and 4 3 nails at seam 2 3 Clamp or hold joist assembly in place flush to top plate and flush against wall stud Drill through wall stud with 7 16 drill bit using hole in joist assembly as a guide Line up holes of joist assembly with holes in studs Secure joist with hex bolts flat washers and lock nuts at both sides Fig A 10 WALL 10 WALL 3 7 6 cm Nails PT LW Flush Flush Fig A 2 x 3 x 96 5 1 x 7 6 ...

Page 39: ...panels centered over loft joists and ledger board Secure with 2 nails spaced 8 apart NOTE There will be a gap of approximately 1 2 13 mm on either side of installed deck panels x1 x1 15 7 8 x 23 7 8 40 3 x 60 6 cm 23 7 8 x 96 60 6 x 244 cm x30 2 5 1 cm Flush 2 5 1 cm Nails 8 20 cm 8 20 cm Flush ...

Page 40: ...ide Install shelf supports at shown heights from floor and flush to wall stud as shown Secure with 3 2 nails 1 2 Flush Flush AC Right x4 Left x8 Flush Flush 60 1 2 153 7 cm 44 1 2 113 cm FLOOR Right Shelf Bracket x4 x72 2 5 1 cm 2 5 1 cm Nails 2 5 1 cm Nails 2 x 3 x10 5 1 x 7 6 x 25 4 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm AC x12 x12 10 WALL LEVEL LEVEL ...

Page 41: ...h to bottom of shelf panels and flush at seams Secure with 2 2 nails at each support and 4 2 nails at seams FINISH 3 Your shelves are now installed 4 x56 2 5 1 cm 7 16 x 11 7 8 x 96 OSB 1 1 x 30 2 x 243 8 cm x2 7 16 x 11 7 8 x 24 OSB 1 1 x 30 2 x 60 1 cm x2 1 x 4 x 96 2 5 x 10 2 x 243 8 cm KP x2 1 x 4 x 24 2 5 x 10 2 x 60 1 cm JS x2 Flush JS JS KP KP Flush 2 5 1 cm Nails 2 5 1 cm Nails 96 243 8 cm...

Page 42: ... 4 3 2 cm Screws PARTS REQUIRED x1 x1 Left Door Right Door DOORS 3 7 6 cm x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA x2 1 1 4 3 2 cm Place doors on flat surface 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and GAA as shown BEGIN 1 OO x1 69 175 3 cm Door Stiffener ...

Page 43: ...mark 3 8 1 cm Fig B 3 7 6 cm x12 Flush against wall panels Fig A OO 2 3 Screw hinge boards into wall supports with 10 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor frame with 2 3 screws Fig A Mark center of door opening OO x1 69 175 3 cm Door Stiffener 5 3 7 6 cm Screws in door stud 2 3 7 6 cm Screws OO TEMPORARY SUPPORT TEMPORARY SUPPORT ...

Page 44: ...g B OO IT IS IMPORTANT TO HOLD THESE DIMENSIONS 12 30 5 cm Approx BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B Secure with 7 2 screws through outside trim into OO 1 Center OO vertically on the right door in the door opening offset 1 2 5 cm from the edge of door Fig B Secure with 7 2 screws through outside trim into OO 2 2 5 1 cm...

Page 45: ... and metal threshold are now installed FINISH Fig B 3 4 1 9 cm Screws AHR AHL AHR AHL AH AH ZJ 3 4 1 9 cm x11 Bagged separately special coating x1 AHL 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm x1 AHR 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 6 cm AH x2 x1 ZJ 19 32 x 2 1 2 x 72 1 5 x 7 6 x 182 9 cm Install 64 metal threshold with 11 3 4 screws 3 3 4 1 9 cm x62 x1 6...

Page 46: ...GIN 1 PARTS REQUIRED DOOR HARDWARE Your decorative door hinges are now installed Install decorative hinges in locations shown Secure with 3 4 screws FINISH 3 4 1 9 cm Screws x4 3 4 1 9 cm x12 Flush to hinge ...

Page 47: ... when loop is connecting base Fig B Mark and pre drill holes for screws Install bolt with screws supplied Drill 5 16 7 9 mm hole deep enough for bolt to slide into Your spring bolts are now installed FINISH 5 16 7 9 mm drill for bolt 1 2 5 cm deep 5 16 7 9 mm drill for bolt 1 2 5 cm deep 1 2 12 7 mm OPEN POSITION Spring is loose OVER DOOR FRAME FLOOR Loop contacts base Loop contacts base OPEN POSI...

Page 48: ... set screw as shown 3 4 Insert handle in hole and secure with 1 1 4 screws FINISH RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through x1 x2 1 1 2 3 8 cm Re drill hole with 3 8 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill Fig A 35 3 4 90 cm 1 3 ...

Page 49: ...6 cm Nails Flush to panel Flush to panel x1 TM 2 x 4 x 72 5 1 x 10 2 x 182 9 cm x6 3 7 6 cm 1 BEGIN Install collar tie TM to the 2nd rafter from the back wall with 3 3 nails at each end COLLAR TIE HINT For best appearance install collar tie on back side of rafter 2nd ...

Page 50: ...ew Window 2 5 1 cm x14 EU x2 19 32 x 2 1 2 x 17 1 6 x 7 6 x 43 2 cm DI x2 19 32 x 2 1 2 x 12 1 5 x 6 3 x 30 5 cm Your gable window and trim is now installed FINISH 3 4 Screws 1 9 cm 12 30 5 cm 3 4 1 9 cm 2 5 1 cm Center Center Flush EU x 2 DI x 2 Install window trim centered over installed window Secure with 3 4 screws and 2 finishing nails as shown Do not screw into frame of window Snip off protr...

Page 51: ...OOK EYE PARTS REQUIRED Install hook into framing if possible BEGIN 1 FINISH Swing door open to locate eye Install hooks in wall and into framing behind Fig A You have installed your hook eyes 2 Hook Fig A Eye ...

Page 52: ...o vents in side walls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm 1 2 Screws 1 3 cm 1 2 Screws 1 3 cm 14 35 6 cm 6 15 2 cm 5 12 7 cm 7 8 17 8 20 3 cm Caulk Caulk ...

Page 53: ... Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Install drip edge over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs o...

Page 54: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Page 55: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 Bend in roof 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 56: ... 5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 cm MAX Top of rain slot Cut Off You have finished shingling your roof Proceed to capping the ridge FINISH Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut s...

Page 57: ...angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush Note You will need about 21 23 cut pieces for 10 x 8 model 21 to 23 Pieces ...

Page 58: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 2 cm ...

Page 59: ...RIGHT FRONT GABLE K 48002309100 2 Front Rear Gable Panel Left 3 8 NG 23 9 16 X 48 LEFT FRONT GABLE K 48002309200 2 Corner Trim 3 8 NG 1 3 4 X 83 1 2 K 83080112000 8 Rearwall Panel A Side Panel SIDING 8 OC 4 X7 11506 6 Rear Panel B EZ 8 23 7 8 X 84 WALL PANEL J 84002314000 1 Frontwall Panel A EZ 8 11 7 8 X 84 PANEL J 840011140WG 1 Frontwall Panel B EZ 8 11 7 8 X 84 PANEL J 84001114NOG 1 Frontwall P...

Page 60: ... siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent st...

Reviews: