2–14
Section 2 — INSTALLATION
2.1
1
MOUNTING PROCEDURE
(Water-Cooled Casting)
These instructions apply to instruments with water
cooled castings. Instructions for mounting standard
castings are provided in Section 2.11.
The MODLINE 4 is ordinarily mounted by the front
circular flange or base mounting pad to fixed
brackets which have been previously installed to
provide the correct line of sight. Mounting dimen-
sions are given in Fig. 2.14.
The instrument may be mounted in any orientation
that will afford a clear, unobstructed line of sight
and a reliable support, and also allow access to
the water, air and cable fittings.
BASE MOUNTING
If you are mounting the MODLINE 4 with no acces-
sories, attach it to the fixture of your choice using
three 1/4–20 NC bolts. Observe grounding precau-
tions in Section 2.15.
For freedom of final adjustment in sighting, the
Swivel Mounting Base, Model SB-3, is recom-
mended as an optional accessory. See Section 5
for a description of this accessory.
FLANGE MOUNTING
The MODLINE 4 can be flange mounted to mount-
ing supports or accessories by means of three
5/16–18 NC bolts supplied. The flange cutouts and
special bolts provide a "quick disconnect' feature
that makes it easy to remove the MODLINE 4 for
lens cleaning and other service routines. The
mounting procedure is illustrated in Fig. 2.15.
Observe the grounding precautions in Section
2.15.
FIG. 2.14 – DIMENSIONS AND CLEARANCES OF WATER-COOLED CASTING
7.40
(187.96 mm)
7.15
(181.61 mm)
2.98”
(75.7 mm)
6.66”
(169.16 mm)
6.81”
(172.97 mm)
4.00”
(101.60 mm)
3.50”
(88.90 mm)
3.68”
93.47 mm)
3.31”
(84.07 mm)
3-0.19” (4.8333 mm) DIA.
Bleed Holes. Spaced 120°
2.75”
(69.85 mm)
1/2” NPT
Air Inlet Connection
1/2” NPT
Water Inlet/Outlet
Connection
1/4” – 20 UNC
(3 Mtg. Holes)
1.125”
(28.57 mm)
1.125”
(28.57 mm)
4.06
(103.12
mm)
0.9”
(22.86
mm)
5.96”
(151.38 mm)
1/2” NPT
Electrical
Connection
Summary of Contents for Modline 4
Page 3: ......
Page 5: ......
Page 6: ......
Page 34: ......
Page 35: ......
Page 36: ...Section 2 INSTALLATION 2 21 ...
Page 37: ...Section 2 INSTALLATION 2 22 ...
Page 49: ...Section 4 MAINTENANCE SERVICE 4 4 NOTES ...