
EN
Six monthly operations
Have the machine checked by personnel trained and authorised by the manufacturer.
Maintenance
The following table specifies the role responsible for each procedure.
The following table specifies the role responsible for each procedure.
O = Operator
O = Operator
A = personnel trained and authorised by the manufacturer.
Interval
Responsible
Description
Procedure
Lubricant/Liquid
Daily
O
Pad
Check, rotate or re
-
place
O
Brush/es
Check and clean
O
Squeegee
Clean and check for
wear or damage
O
Spray shield
Check for wear or
damage
O
Dirty water tank
Empty, rinse, clean
float guard and waste
basket
O
Solution tank
Empty, rinse
O
Batteries
Recharge if needed
Weekly
O
Batteries
Check the electrolyte
level
DW
O
Battery compartment
Check for leakage
O
Squeegee assem-
bly siphon (two-disc
model)
Check. Clean
50 hours
O
Dirty water tank lid
gasket
Check for wear
O
Detergent tank filter
Remove and clean
200 hours
O
Batteries,
terminals
and cables
Check and clean
A
Steering chain
Lubricate, adjust ten
-
sion and check for
wear or damage
GO
A
Steering cable
Check tension. Check
for wear or damage
750 hours
A
Suction motor
Replace the brushes
1250 hours
A
Drive motor
Replace the brushes
A
Brush motors
Replace the brushes
LUBRICANT/LIQUID
LUBRICANT/LIQUID
DW Distilled water
DW Distilled water
ACD Approved commercial detergent
ACD Approved commercial detergent
GO SAE W90 gear oil
GO SAE W90 gear oil
31
Summary of Contents for CT46
Page 2: ...EN ENGLISH Translation of original instructions 2...
Page 6: ...EN MACHINE DIMENSIONS X Y Z See TECHNICAL SPECIFICATIONS table Z Z1 Y X 6...
Page 14: ...EN FIGURES A 2 8 1 5 4 3 7 1 B 14...
Page 15: ...EN 7 2 3 3 4 5 6 6 C 8 4 5 D 1 3 2 4 5 6 15...
Page 16: ...EN E 4 2 3 5 1 F 2 1 3 G 1 2 H 1 16...
Page 17: ...EN I L 17...
Page 18: ...EN Extension Machine power cable 1 2 3 M N O 18...
Page 19: ...EN 2 1 P 19...