1.
Set up unit to run as per operation/owners manual.
Remove DI cartridge filter before
testing and reattach DI cartridge housing housing.
2.
Before connecting the supply water hose to the machine, measure the water flow
from the end of the hose(s).
•
Supply water flow __________________ gpm
3.
Measure the TDS and temperature of the supply water.
•
Supply water TDS __________________ ppm
•
Supply water temperature ____________ °C
4.
Connect the supply water hose to the machine and turn on the water.
•
Supply water pressure _______________ psi
5. Place green waste water hose on the ground to al
low water to flow onto the ground
or into a drain. For
testing purposes, do not connect a pole hose. Wait for 1 minute
to
allow system to stabilize.
6.
Measure the water flow from the wastewater hose.
•
Wastewater flow ___________________ gpm
7.
Measure the water flow from the pure water hose.
•
Pure water flow ____________________ gpm
8.
Measure the TDS of the pure water.
•
Pure water TDS ____________________ ppm
9.
Measure the TDS of the wastewater.
•
Wastewater TDS ____________________ ppm
10.
Turn off machine
water
and compare test results to normal operation specifications
on
page 1
2
.
System Testing
p.
1
2
Summary of Contents for Ultra Pure Systems Hydro Cart Compact
Page 16: ...p 16 Notes...