nano3G AP Installation Manual
Installation Overview and Requirements
N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011
Page 11
2.3.2
nano3G S4 AP Physical Requirements
A nano3G S4 AP may be installed in one of the following ways (see section 6.2.4):
• Free-standing on a flat stable surface.
• Attached to a wall or partition using two screws that engage in keyhole slots in the
rear surface of the AP.
• Attached to a POE splitter using the two screws that engage in keyhole slots in the
rear surface of the AP. The POE splitter in turn attaches to a wall or partition using
two screws.
The unit
must
be vertical to ensure that air can circulate freely around it.
It is recommended to install the AP with its front surface facing the area requiring cellular
coverage, unobstructed by walls or partitions that may have significant RF attenuation.
2.3.3
nano3G S4 AP IP Bandwidth Requirements
At maximum capacity, a nano3G S4 AP will require:
• Downlink: at least 5Mbps
• Uplink: at least 512Kbps
This will deliver up to 4 voice calls and HSDPA services up to 3.6Mbps.
2.3.4
nano3G S4 AP Sundry Installation Equipment
• To mount the POE splitter or the nano3G S4 AP onto the wall:
• 2 self tapping pan head screws, size No. 6 (approx 3.5mm (0.14in) in
diameter)
• Wall plugs if required
• Suitable drills and screwdriver
Dimensions and
weight
Height
176mm (without stand)
193mm (with stand)
Width
170mm
Depth
51mm
Approximate Weight
0.42 kg (AP only)
Environmental
Cooling
Vents on the back at top and bottom
Operating Temperature
0°C to 40°C
Operating Humidity
10 to 70% non-condensing